Retail Price: $187.00
We are an authorized Seymour Duncan Dealer, so you can buy with confidence!
All Manufacurers Warranties apply
The Duncan Distortion gives you a high output while retaining clarity;. A massive ceramic magnet and hot symmetrical coils give this pickup tight puchy lows and a searing high end that really cuts through. Put a pair of these in your guitar for tremendous power and a raw distroted rock sound.
Four conductor cable
This pickup is a direct replacement and requires no guitar modification. Wiring schematic and mounting screws are included.
application
High output humbucker built for aggressive playing styles. Recommended for old school metal, nu-metal, gothic, garage, punk, thrash and other heavy rock styles. Great for drop tunings.
description
Yields high output while retaining clarity. The massive ceramic magnet and hot coil windings deliver tremendous power and raw distorted rock sounds. More aggressive than the SH-5 Duncan Custom. Comes with four-conductor hookup cable.
complete setup
Available for both neck and bridge positions. Often a Distortion bridge is paired with an SH-2n Jazz Model in the neck for good clean tones and versatility.
guitars
For balanced and warm instruments. Works especially well with rosewood fingerboards.
players
John Connolly / Sevendust (bridge), Jerry Horton / Papa Roach (bridge), Meegs Rascon / Coal Chamber (bridge), Wayne Static / Static X (bridge), Eric Peterson / Testament (bridge)