Instructions
Remove any loose particles before applying Repair Express Cement. Apply with a caulking gun or putty knife into the joint or crack. Finishing with a wet spatula or trowel gives the smoothest result. For large cracks, static joints or large screw holes apply 2 layers of the product. Depending on the porosity of the substrate, apply the second layer of product after approx. 30 min.