eBay

eBay








T8280 IR Preheating Oven PCB Preheater T-8280 Infrared Preheating Station





Features:

1. This machine selects the infrared component to give off heat which independent exploration, adopts advanced PID intelligent temperature, controls temperature precisely.

2. T-8280 can achieve to heat PCB board and component which contains lead or not, especially for the BGA and SMD parts.

3. Use infrared heat, easy to cut through, heat portion, don’t have sirocco flow. Don’t shift the small components on the PCB board,ensure the welding quality.

4. This machine has 600W heating system, widely to 280x270mm.Can use together with the handhold infrared welder T-835.

5. Easily operate, you can operate it through easy training.


Technical Parameter:





























Work bench size 410x316mm
Rated voltage and frequency AC110V  60Hz
Complete machine power 1600W
Preheating plate power 1500W
Preheating plate size 280x270mm
Preheating plate temperature adjustable 0-450℃

Main Components:

























Preheating plate main body 1
Temperature sensor 1
PCB board holder 1
Power line 1
User manual (compact disc) 1



Main component function explanation


Operation instructions


1. Inspect the machine and then open it


 Check the connection of the power line.


 Turn on the power switch. Allow the T-8280 Power-On-Self-Test (POST) to complete. After this, Temperature set-points will display last value used.


The black switch on the front panel are used to control the infrared preheating plate; press the blue button “▲”(up)the red button“▼”(down), can adjust the infrared preheating plate temperature between 0  and  450. Press the buttonON”,the infrared preheating plate starts to work, pressOFF”,it stops working.


2. Operation of preheating PCB board


(1) The placement and adjustment of the PCB board


 According to the size of the PCB board, adjust the PCB board holder, then put the PCB board and fix the adjust knob.


According to the size of PCB board and welding technological requirement, press the blue button “▲”(up)and the red button  “▼” (down), regulate the output temperature of preheating plate between 0 and 450


(2) Preheating open and close:


 Press the ON buttonopen the preheating plate about 3-5 minutes, make the temperature be the setting value then carry on the next step .


 Finishing, press OFF, the preheating plate stops working.


AttentionDont close the power switch until the machine full cooling.


The preheating temperature set: If the PCB board contains lead, adjust the infrared preheating plate temperature to 100-120; if not, adjust to 120-140. You can also set the preheating temperature according to the users experience and technology.


3. Machine installation and adjustment:


The preheating plate heating type includes: the total pressure flow-through heating way and the PID percentage adjustment way. You can adjust it according to the preheating allowance. Generally speaking, if the preheating temperature is lower than 

250 

 , selects the PID percentage adjustment method; and if the preheating temperature is higher than 

250

, use the total pressure flow-through heating way.


Adjustment method


1. Press “▲”power-on, display: C=?


2. Press “▲”choose 0 or 1,every press the status change one time,     


C=0 is PID percentage adjustment, C=1 is switching control.


3. Press “▼”OK


Cautions!


1. After finishing, dont turn off the power immediately; make sure the infrared preheating plate complete cooling.


2. Keep the ventilation free-flowing, the infrared preheating plate clean, use dehydrated alcohol clean it regularly!


3. The high temperature operation, pay attention, avoid scalding.


4. If you dont use the machine for a long time, youd better pull off the power source plug!


Warranty 


The whole machine maintains for one year and the spare parts maintains for three months. .Provides the immediate network online Q/A and the technical advisory work service.