30ML/100ML Sealant Coating Liquid Waterproof Strong Adhesion
Specification:
100% Brand new and high quality.
Material: Liquid
Capacity: 30ml,100ml
Shelf life: 3 years
Conversion: 1cm=0.39inch, 1inch=2.54cm
Feature:
Roof Leak Repair Spray: Waterproof Agent, Easily Solve the Problem of Water Leakage. clean the Foundation Surface Before Construction to Ensure That the Foundation Surface is Dry and Dry.
Efficient Waterproof: Jaysuing Seal Rubber Sealant Coating Spray is your quick and easy way to apply, seal, protect and prevent leakage!After drying, you can apply any color.
High temperature and low temperature resistance: This Mighty Sealant Spray will not sag or drip under high temperature in summer.Will not crack or flake in the cold winter.
Long-lasting: with a Quick-drying Ingredients for Easy Plaster, Repair, and Seal.Powerful Solution with a Long-lasting Result. a Waterproof Layer Can Be Formed After 24-48 Hours, and the Waterproof Layer Will Become Stronger over Time.
Multiple Uses: Water Seepage Through Cracks;Water Seepage of Window Sills; Water Seepage in Toilet;Wall Water Seepage;Roof Seepage;Water Seepage of External Wall.
Fit for:
-Water seepage through cracks
-Water seepage of window sill
-Water seepage in toilet
-Wall water seepage
-Roof seepage
-Water seepage of external wall
Product ingredients: Acrylic, Polyurethane and Butyl rubber, Polymer copolymer, Additives, etc.
Reference area: the overall painting of 250g is about 1.5m2, the painting of 600g is about 4m2, and the painting of only 250g is about 3m, 600g is about 6.5m.
Matters needing attention in construction:
1. Clean the ceramic tile floor before construction to keep the floor free of dirt and water stains. If the gap of the ceramic tile is too deep, fill the gap with the plugging king first. Products do not need to be mixed, just brush when the cover is opened. Before construction, block the floor drain to prevent glue leakage.
2. For large-scale construction, it is suggested that the wall should be first followed by the ground, and then the inside should be first followed by the outside, which is convenient for the construction personnel to quit. During the construction, the colloid should be brushed as thin as possible (film formation and drying are faster), and it is recommended to brush the key positions (toilet edge leakage/corner gap) and other parts twice (better effect). During the construction, it should be brushed at one time to form a continuous and flat waterproof film on the base surface.
3. After the construction, it is suggested that the place should be ventilated, and the colloid should not be exposed to water and trampled before it is dried and solidified. When the room temperature is above 20℃, the surface of the colloid will dry after 2 hours, and it can form a film after 5 hours. The lower the temperature, the slower the solidification (the lower the temperature in winter, the solidification time may be affected).
Due to the different coating thickness and ambient temperature, the curing time will be slightly different, which is subject to the actual construction curing time.
Package included:1 X Waterproofing Agent Or
1 set X Waterproofing Agent+Brush
Notice:
1.Please allow 1-3mm error due to manual measurement,Please make sure you do not mind before you bid.
2.The colors may be a little difference for the different monitors displays, please understand.