Preheating Oven T8120

1. The machine selects the infrared highly effective component to give off heat which independent exploration, adopt advanced PID intelligent controlling warm heating technology, controls warm precisely.
2. Can achieve to heat PCB board and component which contains lead or not,especially suit to BGA?SMD.
3. Use infrared heat, easy to cut through, heat proportion, don’t have sirocco flow. Don’t shift the small component on the PCB board,ensure the welding quality.
4. This machine has 600W heating system, widely to 120x120mm.Can use with the handhold infrared welder T-835.
5. Easily operate, can operate it through easy training.

Work floor size

200x240mm

Rated voltage and frequency

AC220-230v/AC110V   60/50Hz

Complete machine power

800W

Preheating chassis power

600W

Preheating chassis size

120x120mm

Preheating chassis temperature adjustable

0-450?

Main Component:
 

Preheating oven main body

1

Temperature sensor

1

Board support of the circuit

1

Power line

1

User manual (compact disc)

1

 
Operation instructions:
1. Starting and inspects before starting:
?Check the temperature sensor and the power line.
?Turn on the power line. Don’t use until passing check. (The nixie tube displays the indoor temperature.)
?The black switch on the front panel use to control the infrared preheating chassis; press “?”up,“?”down,can be at 0-450?,adjust the infrared preheating chassis’s temperature. Press the button“WARM”,the infrared preheating chassis starts to work, press“COOL”,it stops working.
2.Operation of preheating PCB board:
(1) PCB board’s placement and adjustment:
?According to the PCB board’s size, adjust the location of the board support, put the PCB board on the support and fix the screw tightly with hands. Make the temperature measurement head fixed on the PCB board which needs to preheating, use aluminum-foil paper or adhesive paper to stick tightly.
?According to the size of PCB board and welding technological requirement, press “?”and “?”button, between 0? and 450?, regulate the output temperature of preheating chassis.
(2) Preheating opening and closure:
?Press the “WARM” button,open the preheating chassis about 3-5 minutes, make the temperature be about the setting value then carry on the step operation.
?After finishing ,press “COOL”, the preheating chassis stop working.
Attention:This time can’ t close the power switch, after the machine full cooling then close the power source.
?General preheating temperature establishment suggestion: when PCB board has lead ,may adjust the infrared preheating chassis temperature to 100-120? ; When PCB board has non-lead, may adjust  to 120-140? ; Also may set the different preheating temperature voluntarily according to user's use craft and experience.
3. Machine installation and adjustment:
This infrared preheating chassis heating way includes: The total pressure flow-through heating way and the PID percentage adjustment way, you may adjust voluntarily according to the PCB board’s preheating allowance. The general suggestion preheating temperature is lower than 250?, selects the PID percentage adjustment method; The preheating temperature is higher than 250?, use the total pressure flow-through heating way.
Adjustment method:
1.press “?”power-on, display: C=?
2.press “?”choose 0 or 1,every press the status change one time, C=0 is PID percentage adjustment, C=1 is switching control.
 
Caution!
1. After finishing, don’t turn off the power immediately; make the infrared preheating chassis full cooling.
2. Keep the ventilation free-flowing, the infrared preheating chassis pure; use the dehydrated alcohol to be clean regularly!
3. Careful, the high temperature operation, pay attention, avoids scalding.
4. Long-time doesn’t use, should cramp out the power source plug!
Guarantee acceptance
The complete machine maintains for one year and lifelong service. Long-term factory price supply .Provides the immediate network online Q/A and the technical advisory work service.
Statement
Between user operating manual and actual product different place, take actual product as!
ONE YEAR WARRANTY!!

The item will be shipped from China. Any customs tax applied to this package should be covered by buyers. The price does not include any customs tax.


For Dear Buyer:

 

1, Import duties, taxes and charges are NOT included in the item price or shipping charges. Buyers are responsible for these charges. 

A,We will write a lower declared value and mark it as sample or personal gift in the shipping invoice to help customers to

reduce the tax if they have not any special demands, 

but if it is still charged the tax, the Buyers are responsible for these charges. 

B, If you can not ensure it, Please check with your country's customs office to determine what these additional costs will be prior to bidding/buying.

2, when purchase, please notice to leave A contact phone number for the smoothly shipping purposes.

A, The international delivery require to sign the telephone number to make sure the smoothly delivery and we promise do not share any information with third party. 

B, We will ship all the items via FedEx, EMS(China post), DHL, UPS, TNT with the tracking number showed on ebay.  

3.  Multiple purchases saving plan: Please make sure single payment for each item you won. We will combine the shipping when you make multiple purchases.

2. Correct and sufficient corresponding information: Please attached your telephone number when you payment so that we can post your package safety and smoothly. 

Always make sure provide sufficient information to help us make a smoothly delivery.