点击查看图片来源
DESCRIPTION


Product Description:
* Brand new and high quality
* Made of high quality materials, sturdy and
* Working voltage: DC 24-36V
* Working current: 20A
* Power tube: IRFP260N (50 to 200V)
* Size: 100*100*85mm
* Spiral copper tube size: inner diameter 40mm, height 45mm
* color: red
* Material: copper clad laminate+metal

It was found that the input current of the new 30*30 graphite crucible is 25A when the 36V power supply is fully inserted.
Discover molten aluminum power supply requirements: 24V 350W - 500W power supply (15A to 20A) [Melting point: 660 degrees Celsius]
Found to melt copper, gold and silver, power requirements: 36V 700W - 900W power supply (20A to 25A), respectively [melting point: 1083 degrees Celsius, 1065 degrees Celsius, 962 degrees Celsius
Usage: DIY small parts steel quenching, annealing metal smelting below the melting point of 1100 degrees Celsius, DIY small cooking utensils, etc.
Note: Only steel materials can be heated directly (magnets can absorb materials). Gold, silver, copper, and aluminum cannot be heated directly. They need to be smelted with graphite crucibles. Working vortex brass heating requires a large amount of circulating water for cooling. It is possible to cool without water circulation. However, it will burn into black eddy current brass and has little effect.

Package Included:
1 x induction heating plate with fan
1 x spiral copper tube
1 x 2m water pipe

Note:
1.The real color of the item may be slightly different from the pictures shown on website caused by many factors such as brightness of your monitor and light brightness.
2.Please allow slight manual measurement deviation for the data.

POLICES

 

We only ship to confirmed Paypal addresses. Please comfirm that your paypal address is in line with your shipping address.

 

Please kindly note that the combined shipping is not provided because the shipping fee is calculated by weight. Also, the each additional item means exactly the the same color and size. 

 

It takes about 7-15 working days to UK; about 10-30 working days to other countries. Transit time may be a little delayed because of the bad weather and customs inspection. If you do not receive your item within 30 working days since payment finished, please contact us immediately for further assistance.

 



We accept payment via Paypal only.

Payment must be completed within 5 days. If you have any problems about payment, please contact us via ebay message.


 

We strive for 100% customer satisfaction! Positive Feedback is very important to us. If you have any questions, please feel free to contact us via "Ask seller a question" . We will reply your email within 24 working hours.



DataCaciques