30th Anniversary of the First Moon Landing First Day Cover

CC64 1999 from the JS(CC) series. Cover states 'Eagle has landed' and bears the Apollo 11 mission badge and commemorates the first moonlanding. Cover is St Kitts FDC for the 4 moonlanding stamps and miniature sheet cancelled on First Day of Issue.

100% Genuine as obtained in Person


Yuri Vladimirovich Usachyov (Russian Cosmonaut) Usachev

BORN: 9 October 1957, Donetsk, Rostov, Russia.
EDUCATION: Moscow Aviation Institute in 1985.
SPECIAL HONORS: Hero of Russian Federation.
EXPERIENCE: Since 1985 he has worked at the RSC Energia. He joined the cosmonauts of RSC Energia in 1989. From September 1989 to January 1991 he attended the general space training course at the Yu.A. Gagarin Cosmonaut Training Center. From April 1991 to August 1992 he trained for space flight as a member of the test-cosmonaut group in the Mir station program. In 1992 and 1993 he trained for flight on the Mir complex in the Mir-13 program as flight engineer of the backup crew. From February to June 1993 he trained for flight on the Mir complex in the programs Mir-14 and "Altaire" (France) as flight engineer of the backup crew. From August 1993 to January 1994 he trained in the Mir-15 program as flight engineer of the main crew. On January 8, 1994 he flew on Soyuz TM-18 and spent 182 days on the Mir orbital complex returning in July. From April to June 1995 he trained for flight on the Mir station as flight engineer of the backup crew in the Mir -19 and ‘Mir-Shuttle’ programs. On February, 21 1996 he flew on Soyuz TM-23 socking with the Mir Space Station on the 23 February and during his 190 days on the space station went into space six times to install or adjust equipment on the outside of the space station. 

Number of Flights: 4. Total Time: 552.93 days. Number of EVAs: 7. Total EVA Time: 31.48 hours.
Position: Test-cosmonaut of the Energia Rocket-Space Corporation.

2000 May 19 Flight: STS-101. Flight Back: STS-101. Flight Time: 9.84 days. Flight details: STS-101.
2001 Mar 8 Flight: STS-102. Flight Back: STS-105. Flight Time: 167.28 days. Flight details: STS-102.
2001 Jun 8 Flight: EVA STS-102-3. EVA Duration: 0.03 days.

2000 May 19 - STS-101 Assignment: Prime Crew. Flight details: STS-101.
Objective of mission STS-101 was repair, resupply and construction tasks aboard the international space station. This was the first launch with new electronic cockpit displays and other upgrades. The solid boosters separated at 10:13 GMT and the main engines cutoff at 10:19 GMT. The external tank, ET-102 then separated, with both orbiter and ET-102 in a 52 x 320 km initial orbit. At 10:54 GMT the OMS engines fired to raise perigee to 159 x 329 km x at 51.6 deg. Atlantis docked with the International Space Station's PMA-2 docking adapter on the Unity node at 04:31 GMT on May 21. At that time the ISS was in a 332 x 341 km orbit. On May 23 at 00:03 GMT the Atlantis crew opened the first hatch to PMA-2 and entered the Station. The crew replaced a set of batteries in Zarya, installed fans and ducting to improve airflow, and delivered supplies and equipment. Three hour-long orbit raising burns on May 24 and 25 by the RCS engines on Atlantis raised the station to a 372 x 380 km x 51.6 deg orbit. The STS-101 crew left the station on May 26, closing the PMA-2 hatch at 08:08 GMT and undocking at 23:03 GMT. Atlantis performed a 180 degree flyaround of the station and departed the vicinity around 23:44 GMT. Atlantis closed its payload bay doors around 02:30 GMT on May 29 and fired the OMS engines for deorbit at 05:12 GMT.

2001 Mar 8 - STS-102 Assignment: Prime Crew. Flight details: STS-102.
STS 102 was an American shuttle spacecraft that carried a crew of seven astronauts (six American and one Russian). The primary mission was to deliver a multi-rack Italian container (Leonardo MultiPurpose Logistics Module, LMPLM) to the Destiny Module of the International Space Station, ISS. It docked with the ISS at 05:34 UT on 9 March. The 6.4 m x 4.6 m cylindrical LMPLM delivered new equipment to Destiny, and retrieved used/unwanted equipment, and trash back to the shuttle. The crew did a few spacewalks to install a platform on the ISS to support a Canadian robot arm when it arrives next month. The STS 102 left behind three of the astronauts (two American and one Russian) and brought back the three astronauts (one American and two Russian) who had been inhabiting the ISS for about four and a half months. It landed at Cape Canaveral at 07:31 UT on 21 March. Discovery was launched on mission STS-102 (Space Station flight 5A.1) into an initial 60 x 222 km x 51.6 deg orbit. The mission was delivery of supplies and equipment, and changeout of the Expedition One and Expedition Two station crews. STS-102 carried the Leonardo Multi Purpose Logistics Module (MPLM), built by Alenia Spazio (Torino), to the International Space Station. The 6.4 m x 4.6 m cylindrical MPLM was a descendant of the Spacelab long modules. Also carried was a Spacehab/Energia unpressurized Integrated Cargo Carrier with LCA/MTSAS-A, RU, and PFCS. A sidewall adapter beam with two GAS canisters (G-783 and WSVFM) was also on board. WSVFM measured vibration during launch. Another adapter beam, probably at the rear of the payload bay, carried SEM-9. SEM-9 and G-783 contained high school microgravity experiments. The orbiter fired its OMS engines at 1221 GMT to raise the orbit to 185 x 219 km. Discovery docked with the PMA-2 port on the Station at 0639 GMT on March 10. The LCA (Lab Cradle Assembly) was attached to Destiny's +Z side during an EVA. It was to be used on the next mission to temporarily place a Spacelab pallet on Destiny during installation of the Station's robot arm. Later, it would be the site for the main Station truss, beginning with segment S0. The PMA-3, on Unity at the -Z nadir position, had to be moved to the port position to make room for Leonardo. An external stowage platform was attached to Destiny and the External Stowage Platform and the PFCS Pump Flow Control System were added to the port aft trunnion on Destiny. A rigid umbilical (RU) was connected to the PDGF grapple fixture on Destiny to support the Station's future robot arm. Leonardo was docked to Unity at -Z for a while so that its cargo could be transferred to the station easily; it was then be returned to the payload bay and brought back to earth. At 0232 GMT on March 19 command of ISS was transferred to Expedition 2 and the hatches were closed. Discovery undocked at 0432 GMT and flew once around the station before departing at 0548 GMT. The OMS engines fired for the deorbit burn at 0625 GMT on March 21, and Discovery touched down on runway 15 at Kennedy Space Center at 0731 GMT.

2001 Aug 10 - STS-105 Assignment: Return Crew. Flight details: STS-105.
STS 105 was an American shuttle that carried a crew of ten (including three crew for the ISS - one American and two Russian), five tonnes of supplies, hardware, and a bedroom suite to accommodate a third astronaut in the Destiny module. The crew installed in the station two new science experiment racks that were carried in the Leonardo container which was first lifted out of the shuttle and bolted to the Unity module. Leonardo then carried back all the trash from the ISS back to the shuttle. They crew installed the MISSE (Materials International Space Station Experiment) container outside the ISS to test the effect of radiation on materials and some low-cost science experiments such as microgravity cell growth studies inside the station. STS-105 main engine cutoff was at 2118 GMT placed Discovery and external tank ET-110 into a 58 x 234 km x 51.6 deg orbit. At 2148 GMT Discovery reached apogee and fired its OMS engines to enter a 155 x 233 km x 51.6 deg orbit; another burn at 0100 GMT raised the orbit to 198 x 277 km. Discovery docked at the Station's PMA-2 port at 1842 GMT on August 12. After some problems aligning the docking system, the docking ring was retracted and latched at 1905 GMT and the hatch was opened to ISS at 2042 GMT. Expedition 3 began on August 13 at 1915 GMT when the new crew's seat liners were installed on the Soyuz transport ship. The formal EX-2/EX-3 change-of-command ceremony was held on August 17 in Destiny. The Leonardo MPLM module was lifted out of Discovery's payload bay at 1326 GMT on August 13 and docked to Unity's nadir at 1554 GMT. 3300 kg of cargo from Leonardo was transferred to the Station. Then 1700 kg of station garbage and materials were loaded into Leonardo. It was unberthed from Unity at 1816 GMT on August 19 and returned to the payload bay for the return to Earth at 1917 GMT. Discovery undocked at 1452 GMT on August 20 with the Expedition 2 crew aboard, leaving Expedition 3 at the Station. At 1830 GMT on August 20 the Simplesat test satellite was ejected from a GAS canister in the cargo bay. Discovery landed at Kennedy Space Center at 1822:58 GMT on August 22 on runway 15, after a deorbit burn at 1715 GMT. The Expedition Two crew of Usachyov, Voss and Helms had been in space for 167 days.

We usually have lots of other items up for sale so why not have a look