Kova logo
USE OUR INSTANT ONLINE CALCULATOR TO GET AN IMMEDIATE QUOTE kovapartitions.co.uk /product/glass-partition-high-ceiling/

GLASS PARTITIONS FOR HIGH CEILING

High wall glass partition systems extend from the ground up rather than stopping short at some predetermined height. Installing a full-height glazed partition system in a contemporary workplace has several advantages, including soundproofing, natural lighting, privacy through frosting or smart glass integration, and more room for privacy.

Their contemporary beauty comes from the simplicity of their design, the clarity of their perspectives, and the practicality of their design. In contrast to the traditional, solid walls that separate offices, break rooms, conference rooms, and cubicles, full-height partitions encourage a more collaborative and communicative atmosphere.

Kova Partitions’ specialists would love to transform your office into a spectacular workplace to create not just a practical, but also a beautiful and creative high-ceiling space.

INSTALLATION PROCESS
1. Quote

Get instant glass partitioning for high ceiling prices by placing the dimensions (height and width) of your required glazed partition into our quick online calculator.

2. Confirm

Our professional will call you to find out more about your requirements, and to modify the cost for glass wall partitions if needed. Then you will be emailed a quote, including all the details you provided regarding glass partition dimensions, your glass thickness for partition requirements, and the cost for your high ceiling glazed partitions.

3. Proceeding

Once you approve the quote our engineer will visit the site and take all the measurements for the glass before buying the glass partition.

4. First visit

After the total price is confirmed and the final payment is made, our professional team will start to install the track, and measure the glass panels for your single-glazed high ceiling partitioning system.

5. Second visit*

The lead-time on glass panels is approximately one week, and installation takes up to 2 days.

*In some cases we are able to install the track and glass panels in one visit.