The Live with wood Price Promise.


Whats New In Primavera P6 Version 20

  • NEW! Add Comments Directly On Relationships

The implementation of the is pretty simple. It’s a new text field called “Comments” that was added so you can leave documentation on specific relationships. Currently you’ve got 250 characters to work with.

This is a nice additional feature in Primavera P6 version 20 and will help Contractors and Owners reach a new level of transparency around relationships.

  • More Options when Scheduling Multiple Projects

If you ever manage multiple smaller projects together as a megaproject you’ll be able to take advantage of this new P6 v20 feature.

When you open 2 or more projects together, you’ll see some changes to the Scheduling Options screen. (Actually you’ll see these changes even with 1 project open now, but with 2 or more project open, these options come alive).

At the top of P6’s Scheduling Options screen, you’ll now see the option to choose which project’s Scheduling Options to use when scheduling your projects.

  • New Setting: All Projects Use Their Own Data Date

Oracle has migrated an option that used to only be in P6 Eppm over to Primavera P6 Professional in version 20

The option is called “All projects use their own Data Date” and you’ll see it on the Scheduling screen. Again this is applicable when scheduling multiple projects at the same time. You can now choose to set a single data date when scheduling a group of projects, or to let projects keep using their own Data Date.

One of the trickiest parts of working with sub-projects that combine into a megaproject is around Data Date. Typically every project would have a different Data Date. Now with this new feature schedulers will have a lot more control over which Data Date gets used in a multi-project scheduling scenario.

&

Primavera Risk Analysis

 

Primavera Risk Analysis is a full lifecycle risk analysis solution that integrates cost and schedule risks. It provides a comprehensive means of determining confidence levels for project success, together with quick and easy techniques for determining contingency and risk response plans. You'll have an objective view of mitigation plans to account for cost and schedule uncertainty, as well as analyzing the cost effectiveness of risk response plans. Combined, these form the basis of a "risk adjusted schedule," which today is becoming the norm within the planning and scheduling process.

 

Primavera Risk Analysis helps project-driven organizations ensure that mission-critical projects come in on time and on budge



With Primavera Risk Analysis you'll have an objective view of required contingency to account for cost and schedule uncertainty as well as analyzing the cost effectiveness of risk response plans. Combined, these form the basis of a "risk adjusted schedule," which today is becoming the norm within the planning and scheduling process.

 

Cheapest on eBay. All Items Price Matched. 2 Hour Download Delivery

This is the most popular and versatile Standalone Project Management Software on the Market today.

Perpetual License is permanent and never expires without restrictions.

Item will come download link delivered with detailed Install & Pro User Guides.

Windows 8,10, 11 or Mac Op system.


Currently in Stock:

Primavera P6 V8 (64bit) With User/Installation Guides.

Primavera P6 V15 (64bit) With User/Installation Guides.

Primavera P6 V16 (64bit) With User/Installation Guides.

Primavera P6 V17 (64bit) With User/Installation Guides.

Primavera P6 V18 (64bit) With User/Installation Guides.

Primavera P6 V19 (64bit) With User/Installation Guides.

Primavera P6 V20 (64bit) With User/Installation Guides.

Primavera P6 V21 (64bit) With User/Installation Guides.

Primavera Risk Analysis Version 8.7 (64bit) With 24 page tutorial.

Oracle Crystal Ball v11.

Oracle Contracts Management v13

AspenONE v14

Chemcad Suite 7