1. NEW FRONT OR REAR 1310 DRIVESHAFT. 2" 120 WALL D.O.M. TUBING.MADE WITH ONLY TOP OF THE LINE PARTS. SPICER GREASE ABLE UJOINTS.  DRIVESHAFT MADE TO THE LENGTH YOU NEED. LOOK AT THE PICTURE TO SEE HOW TO GET A WORKING LENGTH OF YOUR DRIVESHAFT. I USE THE 7" LONG SLIP AND SPLINE, NOT JUST THE CHEAP 3" ON THE END OF THE SPLINE. I USE GRADE 9 SPLINE NOT GRADE 5 LIKE OTHERS USE. I USE FORGED SLIPS, OTHERS USE CHEAP CAST ONES. I USE THE GOOD DUST CAPS THAT ARE CUT TO FIT THE SPLINE. OTHERS USE UN CUT DUST CAPS LETTING GREASE OUT AND WATER IN.     SPIN BALANCED AT 5700 RPM.100 MILES AN HOUR ON MY ROCKWELL BALANCER. OTHERS SAY 100 ONLY SPINE THERE DRIVESHAFTS AT 2100 RPM. WE HAVE BUILT DRIVESHAFT FOR 75 YEARS. call curtis or email me.                                                                                          MY DRIVESHAFTS   ARE COMPETION PROVEN, TRAIL TESTED AND BUILT SHOW QUALITY. LOOK AT THE COMPETION RIGS THAT RUN MY DRIVESHAFTS, ONLY THE BEST WILL DO.



On Jul-08-10 at 18:25:29 PDT, seller added the following information:

MyStoreMaps

Add a map to your own listings. FREE Trial !