Notes
1.It must be installed vertically upward, and it is strictly prohibited to place it sideways or horizontally for fixation. And the height of the junction box must be above the sprinkler outlet plate to prevent water from entering the junction box.
2.Please note that the volume of water flow depends on the temperature, the less water, the higher temperature.
3.Please do not use the shower with a key to stop or with the shift water function class, you must use the equipped water flow control valve to control the water flow and temperature.
4.Please note that water and electricity must be supplied before installation for the first time. After installation, please first pass cold water for 1 to 2 minutes to observe whether there is water leakage at each interface, and then turn on the electricity to heat. It is forbidden to electrify under a freezing state.
Remarque 1. Il doit être vertical vers le Haut lors de l'installation, il est strictement interdit de placer des fixations horizontales ou horizontales. Et la hauteur de la boîte de jonction doit être supérieure à la plaque de sortie de l'arroseur pour empêcher l'eau d'entrer dans la boîte de jonction.2.veuillez noter que la quantité d'eau dépend de la température, moins la quantité d'eau est importante, plus la température est élevée.3.veuillez ne pas utiliser une douche à clé pour arrêter ou une douche avec un niveau de fonction de coulée, vous devez utiliser une vanne de contrôle du débit d'eau équipée pour contrôler le débit et la température.4.veuillez noter que l'alimentation en eau et en électricité doit être fournie avant la première installation. Après l'installation, s'il vous plaît laissez couler de l'eau froide pendant 1 à 2 minutes pour voir si chaque interface fuit, puis Allumez le chauffage. La mise sous tension est interdite dans un état gelé.