A Family Business since 2001

on all our items

is included with all our items

WATER UNDERFLOOR HEATING KIT MANIFOLDS 2 to 8 PORTS A RATED GRUNDFOS, PUMP PACK.
 

 

 

 

  

 

Underfloor Heating manifolds comes with:

 

"A" Rated Grundfos Pump Pack.

"A" Rated Wilo Pump Pack.

"A" Rated Bastion Pump Pack.

 

Items included:

 

1 x pre-mounted manifold with flow meters

1 x end vent.

1 x pressure gauge

2 x ball valves

2 x temp gauge (fitted to ball valves)

 

Eurocones fitting (ex: 8 port 16 euros, 16mmx2mm)

 

1 Sample per customer

 

Options:

 

“A” Rated Grundfos Flex UMP3 or Wilo or Bastion pump.

 

Pump station (blending valve)

 

Brass/nickel plated push fittings, easy to install available with up to 8 ports.

Supplied on a pre-mounted bracket.

CMax working pressure 3 bar max test pressure 10 bar.

 

Grundfos UPM3 A-rated pump or Wilo A-rated pump our mixer set has a thermostatic valve to control the flow temperature of water to the underfloor heating pipes.

Temperature range: 35C - 65CMax working pressure:

10 bar compression connections for ease of installation.

 

Our manifolds are for use on underfloor heating systems. These consist of two

manifold bars, one for the flow and one for the return, complete with ball valves, drain/

filling valves and air vent. On the flow bar each port has a high-performance flow indicator, with isolator including an easy-to-read gauge-glass.

Each port on the return bar is equipped with an integral control valve and protection cap which allows the user

to adjust the volume of water or can be removed to accept a Manifold Thermoelectric head.

 

Manifold dimensions:

 

Please add 150mm to the length when the pump and mixer are fitted.

Underfloor Heating manifolds comes with:

 

"A" Rated Grundfos Pump Pack.

"A" Rated Wilo Pump Pack.

"A" Rated Bastion Pump Pack.

 

Items included:

 

1 x pre-mounted manifold with flow meters

1 x end vent

1 x pressure gauge

2 x ball valves

2 x temp gauge (fitted to ball valves)

 

Eurocones fitting (ex: 8 port 16 euros, 16mmx2mm)

 

1 Sample per customer

 

Options:

 

“A” Rated Grundfos Flex UMP3 or Wilo or Bastion pump.

 

Pump station (blending valve)

 

Brass/nickel plated push fittings, easy to install available with up to 12 ports.

Supplied on a pre-mounted bracket.

CMax working pressure 3 bar max test pressure 10 bar.

 

Grundfos UPM3 A-rated pump or Wilo A-rated pump our mixer set has a thermostatic valve to control the flow temperature of water to the underfloor heating pipes.

Temperature range: 35C - 65CMax working pressure:

10 bar compression connections for ease of installation.

 

Our manifolds are for use on underfloor heating systems. These consist of two

manifold bars, one for the flow and one for the return, complete with ball valves, drain/

filling valves and air vent. On the flow bar each port has a high-performance flow indicator, with isolator including an easy-to-read gauge-glass.

Each port on the return bar is equipped with an integral control valve and protection cap which allows the user

to adjust the volume of water or can be removed to accept a Manifold Thermoelectric head.

 

Manifold dimensions:

 

Please add 150mm to the length when the pump and mixer are fitted. 

 

Please see image 12 for key.

 

 

                                                                                                                                          A             B           C         D            E

2 circuit UFH manifold kit 320mm 210mm 50mm 276mm 90mm

3 circuit UFH manifold kit 320mm 210mm 50mm 326mm 90mm

4 circuit UFH manifold kit 320mm 210mm 50mm 376mm 90mm

5 circuit UFH manifold kit 320mm 210mm 50mm 426mm 90mm

6 circuit UFH manifold kit 320mm 210mm 50mm 476mm 90mm

7 circuit UFH manifold kit 320mm 210mm 50mm 526mm 90mm

8 circuit UFH manifold kit 320mm 210mm 50mm 576mm 90mm

9 circuit UFH manifold kit 320mm 210mm 50mm 626mm 90mm

10 circuit UFH manifold kit 320mm 210mm 50mm 676mm 90mm

11 circuit UFH manifold kit 320mm 210mm 50mm 726mm 90mm

12 circuit UFH manifold kit 320mm 210mm 50mm 776mm 90mm

 

Installation for a Multiple Room

1.   Select a suitable location for the pump and manifold unit and mount on the wall. See next page for assembly.

 

2.   Refer to the typical pipe installation drawings and determine the pipe layout - the layout is not critical and can be varied to suit site conditions, the important criteria being the pipe spacing, see below

 

3.   The pipe is marked every metre by the metre. (maximum length for any circuit Is 100m.70m for low profile 12mm pipe circuit).

 

4.   Pipes should be laid l 00mm away from walls

 

5.   Do not lay pipe under fixed units.

 

6.   Lay the rooms furthest from the manifold and work back, do the room with the manifold last.

 

7.      hen pipes to/from one area pass through another area, the two pipes should be run together, the 'bunches' of pipes should then be spaced as if they were one pipe.

 

8.     Lay the pipe as planned, fixing every 50cm if on a screeded celotex base and return to the manifold.

 

9.     If the pipe is kinked when bending. the pipe should be straightened and rearranged so that the location of the kink remains in a straight length, no other remedial action is required.

 

 

 

 

FILLING THE MANIFOLD SYSTEM (cont.)

 

1.     IMPORTANT that the underfloor heating system is properly filled with water and purged completely of air to ensure correct operation, it is therefore necessary to follow the procedure below.

 

2.        IT IS NOT ADEQUATE TO FILL THE SYSTEM USING THE BOILER FILLING LOOP!

 

3.        Connect a hose from a mains pressure cold water supply to the hose connection on the top (flow) manifold, and another hose from the hose connection on the bottom (return) manifold to a drain.

 

4.        Ensure that all the white caps on the bottom (return) manifold are screwed down, closing the valves.

 

 

5.        Ensure that the main flow & return ball valves are closed on the manifold.

6.        Turn on the water and open the hose connection valve on the top (flow) manifold.

7          Open the first circuit valve by unscrewing the white cap allowing water to flow into the pipe.

8.        Open the hose connection valve on the bottom (return manifold) allowing water to flow freely into the drain until the water is clear with no air bubbles.

9.        Open the second circuit valve (white cap) and close the first.

 

1o.      Open the third circuit valve and close the second etc.

 

11.      Continue until the last circuit has been purged and close the hose connection valve on the bottom (return) manifold before closing the last circuit valve (white cap).

 

12.      While under pressure, check manifold & pipework for leakage.

 

13.      Close hose connection valve on the top (flow manifold) and remove the hoses.

 

 

 

COMMISSIONING

1.        Screed or chipboard flooring should be laid immediately after pipelaying to protect the pipe.

 

2.        Concrete screed floors must be cured before any heat is applied, a general rule of thumb is to allow 7 days per 2 millimetres of the                    screed.

 

3.        Timber floor with drymix infill can have heat applied immediately, the drymix must be dried completely before laying the flooring.

 

4.        Hardwood timber flooring must be 'conditioned' before fixing.

 

5.        It is important to purge the pipework from the boiler to the manifold, to avoid air being introduced into the underfloor heating system.

 

6.        It is not normally necessary to balance the system but if required follow this procedure. The system is balanced by running the pump and adjusting the flow to each zone by turning the square spigot s under the white caps on the

bottom manifold, the flow in the respective sight glasses should be set at a figure calculated by dividing the length of pipe for that zone by 40. Example: Circuit 1, 85m/40= approx2 on the scale. Low profile systems circuit at

70m;-40=1.75.

 

7.        Fit actuators to valves after connecting the control wiring.

 

8.        It is important that the actuators are screwed tightly on to the valve.

 

9.        Initially start the system with the thermo­ static valve set at min (35°c).

10.      Increase the setting by 5°c per day, up to a maximum of 50° for concrete floors, max 65° for timber floors.

11.      The flow & return from the boiler should be connected to the manifold connections shown using compression couplings.

12.      NOTE. When first starting up the system it may take 12-24 hours for the heating effect.

 

 

MAINTENANCE We recommend that the following maintenance be carried out annually.

1.        Check that all actuator nuts are tightened firmly and that actuators are not loose.

2.        Remove end plug from pump and check that pump rotates when energised.

 

3.        Turn up thermostats & check that actuators move into open position also check flow gauges are indicating. If not, re-pressurise manifold, remove indicator, clean & replace, repressurise manifold.

 

  

       

Payment
Shipping
Returns

We accept payment by any of the following methods:

PayPal

Credit/Debit Card

Cash on Collection

Please pay as soon as possible after winning an auction, as that will allow us to post your item to you sooner! 

​​​​​​​All orders come with a Vat invoice.

We offer FREE shipping on all orders!

Your order will be dispatched the same working day when ordered before 2pm (receiving payment) (Monday-Friday) and you should expect to receive the next working day. (Monday-Friday)

Weekend order along with public holiday's will be dispatched the following working day.

All orders placed over the Christmas Holiday will be dispatched in the new year.

In the very unlikely event that your item is lost or damaged during post, then WE are responsible and will issue either a full refund or replacement.

We use DPD and Parcel Force along with a pallet company for larger orders.

If you are not 100% satisfied with your purchase, you can return the product and get a full refund or exchange the product for another one.

You can return a product for up to 60 days from the date you purchased it.

Any product you return must be in the same condition you received it and in the original packaging. Please keep the receipt.

Uponor, Polypipe, Warmup, UFH Direct, Screwfix, The Underfloor Heating Store, Prowarm, Ambient, Ambivent, Reliance RWC, Reliable, PSW Trade Suppliers, The Underfloor Heating Company, Sheilds Trading Underfloor Heating,  Plumb Nation, Nu-Heat, John Guest, Omnie, Solo Heat, Wavin, Danfos, Devi, Rayotec, Demister, Demista, Heatmiser, Prowarm, Underfloor Heating Express, Warmer, Grundfos pums UPM3, ups2, Wilo, Ecocirc, Heating Master Store, VPS Trading, Living Heat Underfloor Heating, water underfloor heating kit, insulation, thermostat, single zone water underfloor heating kit, water controller, neo stat, neostat v2, neohub, Neo Hub, neoplug, uh-8 wiring centre, uh-4, uh-8-rf, DS-Setback, water underfloor heating cost, system, Electric Underfloor Heating 150w 200w

See our other items

Kudos Trading is a online brand for Floor Heating Systems Ltd.

Underfloor Heating:


Kudos Trading is one of the UK’s leading underfloor heating brands. It is sold exclusively by our company Floor Heating Systems Ltd. We are one of the largest suppliers of Underfloor Heating Systems in the UK, but still able to offer a personal service with our staff based in Nottinghamshire. We are dedicated to supplying the best quality underfloor heating products at affordable prices & this is supported by first-class customer service & advice. Whether you are just tiling a small bathroom or looking for a full home heating system, we are confident that we have the right system for you.

Our Range includes water underfloor heating kits or just the underfloor heating manifold, underfloor heating pipe, heated floor mat, free cable, insulation, mirror demister pads, plus many products.


Where to Start with Underfloor Heating:


There are now dozens of web-based businesses selling underfloor heating, some are well established & some are new to underfloor heating & have little experience. So how do you sort the wood from the trees? Our advice is to do some basic research on the company; do they give you an address & a number you can contact if something goes wrong?

We have been around since 2001, if you need to call us for advice our number is at the very bottom of the listing for company information.


Designed for DIY Installation:

​​​​​​​

Our systems are designed for the DIY’er (connections must be made by an electrician), so if you know which type of underfloor heating you are looking for, please browse the relevant section of our eBay shop. You can place your order within eBay and we aim to deliver all stocked items next working day.


Let us do the work for you, email us with details of your underfloor heating project & we will be happy to explain your options. There is absolutely no obligation and we are happy to confirm all quotes in writing adding all relevant eBay item numbers for you to find items in our Bay shop. If you live in the Midlands you are welcome to come to our factory showroom & see our products for yourself, we will be happy to sit down & discuss your options.


Kudos Trading
A Family Business since 2001
WATER UNDERFLOOR HEATING KIT MANIFOLDS 2 to 8 PORTS A RATED GRUNDFOS, PUMP PACK.
 

 

 

 

  

 

Underfloor Heating manifolds comes with:

 

"A" Rated Grundfos Pump Pack.

"A" Rated Wilo Pump Pack.

"A" Rated Bastion Pump Pack.

 

Items included:

 

1 x pre-mounted manifold with flow meters

1 x end vent.

1 x pressure gauge

2 x ball valves

2 x temp gauge (fitted to ball valves)

 

Eurocones fitting (ex: 8 port 16 euros, 16mmx2mm)

 

1 Sample per customer

 

Options:

 

“A” Rated Grundfos Flex UMP3 or Wilo or Bastion pump.

 

Pump station (blending valve)

 

Brass/nickel plated push fittings, easy to install available with up to 8 ports.

Supplied on a pre-mounted bracket.

CMax working pressure 3 bar max test pressure 10 bar.

 

Grundfos UPM3 A-rated pump or Wilo A-rated pump our mixer set has a thermostatic valve to control the flow temperature of water to the underfloor heating pipes.

Temperature range: 35C - 65CMax working pressure:

10 bar compression connections for ease of installation.

 

Our manifolds are for use on underfloor heating systems. These consist of two

manifold bars, one for the flow and one for the return, complete with ball valves, drain/

filling valves and air vent. On the flow bar each port has a high-performance flow indicator, with isolator including an easy-to-read gauge-glass.

Each port on the return bar is equipped with an integral control valve and protection cap which allows the user

to adjust the volume of water or can be removed to accept a Manifold Thermoelectric head.

 

Manifold dimensions:

 

Please add 150mm to the length when the pump and mixer are fitted.

Underfloor Heating manifolds comes with:

 

"A" Rated Grundfos Pump Pack.

"A" Rated Wilo Pump Pack.

"A" Rated Bastion Pump Pack.

 

Items included:

 

1 x pre-mounted manifold with flow meters

1 x end vent

1 x pressure gauge

2 x ball valves

2 x temp gauge (fitted to ball valves)

 

Eurocones fitting (ex: 8 port 16 euros, 16mmx2mm)

 

1 Sample per customer

 

Options:

 

“A” Rated Grundfos Flex UMP3 or Wilo or Bastion pump.

 

Pump station (blending valve)

 

Brass/nickel plated push fittings, easy to install available with up to 12 ports.

Supplied on a pre-mounted bracket.

CMax working pressure 3 bar max test pressure 10 bar.

 

Grundfos UPM3 A-rated pump or Wilo A-rated pump our mixer set has a thermostatic valve to control the flow temperature of water to the underfloor heating pipes.

Temperature range: 35C - 65CMax working pressure:

10 bar compression connections for ease of installation.

 

Our manifolds are for use on underfloor heating systems. These consist of two

manifold bars, one for the flow and one for the return, complete with ball valves, drain/

filling valves and air vent. On the flow bar each port has a high-performance flow indicator, with isolator including an easy-to-read gauge-glass.

Each port on the return bar is equipped with an integral control valve and protection cap which allows the user

to adjust the volume of water or can be removed to accept a Manifold Thermoelectric head.

 

Manifold dimensions:

 

Please add 150mm to the length when the pump and mixer are fitted. 

 

Please see image 12 for key.

 

 

                                                                                                                                          A             B           C         D            E

2 circuit UFH manifold kit 320mm 210mm 50mm 276mm 90mm

3 circuit UFH manifold kit 320mm 210mm 50mm 326mm 90mm

4 circuit UFH manifold kit 320mm 210mm 50mm 376mm 90mm

5 circuit UFH manifold kit 320mm 210mm 50mm 426mm 90mm

6 circuit UFH manifold kit 320mm 210mm 50mm 476mm 90mm

7 circuit UFH manifold kit 320mm 210mm 50mm 526mm 90mm

8 circuit UFH manifold kit 320mm 210mm 50mm 576mm 90mm

9 circuit UFH manifold kit 320mm 210mm 50mm 626mm 90mm

10 circuit UFH manifold kit 320mm 210mm 50mm 676mm 90mm

11 circuit UFH manifold kit 320mm 210mm 50mm 726mm 90mm

12 circuit UFH manifold kit 320mm 210mm 50mm 776mm 90mm

 

Installation for a Multiple Room

1.   Select a suitable location for the pump and manifold unit and mount on the wall. See next page for assembly.

 

2.   Refer to the typical pipe installation drawings and determine the pipe layout - the layout is not critical and can be varied to suit site conditions, the important criteria being the pipe spacing, see below

 

3.   The pipe is marked every metre by the metre. (maximum length for any circuit Is 100m.70m for low profile 12mm pipe circuit).

 

4.   Pipes should be laid l 00mm away from walls

 

5.   Do not lay pipe under fixed units.

 

6.   Lay the rooms furthest from the manifold and work back, do the room with the manifold last.

 

7.      hen pipes to/from one area pass through another area, the two pipes should be run together, the 'bunches' of pipes should then be spaced as if they were one pipe.

 

8.     Lay the pipe as planned, fixing every 50cm if on a screeded celotex base and return to the manifold.

 

9.     If the pipe is kinked when bending. the pipe should be straightened and rearranged so that the location of the kink remains in a straight length, no other remedial action is required.

 

 

 

 

FILLING THE MANIFOLD SYSTEM (cont.)

 

1.     IMPORTANT that the underfloor heating system is properly filled with water and purged completely of air to ensure correct operation, it is therefore necessary to follow the procedure below.

 

2.        IT IS NOT ADEQUATE TO FILL THE SYSTEM USING THE BOILER FILLING LOOP!

 

3.        Connect a hose from a mains pressure cold water supply to the hose connection on the top (flow) manifold, and another hose from the hose connection on the bottom (return) manifold to a drain.

 

4.        Ensure that all the white caps on the bottom (return) manifold are screwed down, closing the valves.

 

 

5.        Ensure that the main flow & return ball valves are closed on the manifold.

6.        Turn on the water and open the hose connection valve on the top (flow) manifold.

7          Open the first circuit valve by unscrewing the white cap allowing water to flow into the pipe.

8.        Open the hose connection valve on the bottom (return manifold) allowing water to flow freely into the drain until the water is clear with no air bubbles.

9.        Open the second circuit valve (white cap) and close the first.

 

1o.      Open the third circuit valve and close the second etc.

 

11.      Continue until the last circuit has been purged and close the hose connection valve on the bottom (return) manifold before closing the last circuit valve (white cap).

 

12.      While under pressure, check manifold & pipework for leakage.

 

13.      Close hose connection valve on the top (flow manifold) and remove the hoses.

 

 

 

COMMISSIONING

1.        Screed or chipboard flooring should be laid immediately after pipelaying to protect the pipe.

 

2.        Concrete screed floors must be cured before any heat is applied, a general rule of thumb is to allow 7 days per 2 millimetres of the                    screed.

 

3.        Timber floor with drymix infill can have heat applied immediately, the drymix must be dried completely before laying the flooring.

 

4.        Hardwood timber flooring must be 'conditioned' before fixing.

 

5.        It is important to purge the pipework from the boiler to the manifold, to avoid air being introduced into the underfloor heating system.

 

6.        It is not normally necessary to balance the system but if required follow this procedure. The system is balanced by running the pump and adjusting the flow to each zone by turning the square spigot s under the white caps on the

bottom manifold, the flow in the respective sight glasses should be set at a figure calculated by dividing the length of pipe for that zone by 40. Example: Circuit 1, 85m/40= approx2 on the scale. Low profile systems circuit at

70m;-40=1.75.

 

7.        Fit actuators to valves after connecting the control wiring.

 

8.        It is important that the actuators are screwed tightly on to the valve.

 

9.        Initially start the system with the thermo­ static valve set at min (35°c).

10.      Increase the setting by 5°c per day, up to a maximum of 50° for concrete floors, max 65° for timber floors.

11.      The flow & return from the boiler should be connected to the manifold connections shown using compression couplings.

12.      NOTE. When first starting up the system it may take 12-24 hours for the heating effect.

 

 

MAINTENANCE We recommend that the following maintenance be carried out annually.

1.        Check that all actuator nuts are tightened firmly and that actuators are not loose.

2.        Remove end plug from pump and check that pump rotates when energised.

 

3.        Turn up thermostats & check that actuators move into open position also check flow gauges are indicating. If not, re-pressurise manifold, remove indicator, clean & replace, repressurise manifold.

 

  

       

Kudos Trading is a online brand for Floor Heating Systems Ltd.

See our other items

Underfloor Heating:


Kudos Trading is one of the UK’s leading underfloor heating brands. It is sold exclusively by our company Floor Heating Systems Ltd. We are one of the largest suppliers of Underfloor Heating Systems in the UK, but still able to offer a personal service with our staff based in Nottinghamshire. We are dedicated to supplying the best quality underfloor heating products at affordable prices & this is supported by first-class customer service & advice. Whether you are just tiling a small bathroom or looking for a full home heating system, we are confident that we have the right system for you.

Our Range includes water underfloor heating kits or just the underfloor heating manifold, underfloor heating pipe, heated floor mat, free cable, insulation, mirror demister pads, plus many products.


Where to Start with Underfloor Heating:


There are now dozens of web-based businesses selling underfloor heating, some are well established & some are new to underfloor heating & have little experience. So how do you sort the wood from the trees? Our advice is to do some basic research on the company; do they give you an address & a number you can contact if something goes wrong?

We have been around since 2001, if you need to call us for advice our number is at the very bottom of the listing for company information.


Designed for DIY Installation:

​​​​​​​

Our systems are designed for the DIY’er (connections must be made by an electrician), so if you know which type of underfloor heating you are looking for, please browse the relevant section of our eBay shop. You can place your order within eBay and we aim to deliver all stocked items next working day.


Let us do the work for you, email us with details of your underfloor heating project & we will be happy to explain your options. There is absolutely no obligation and we are happy to confirm all quotes in writing adding all relevant eBay item numbers for you to find items in our Bay shop. If you live in the Midlands you are welcome to come to our factory showroom & see our products for yourself, we will be happy to sit down & discuss your options.


We accept payment by any of the following methods:

PayPal

Credit/Debit Card

Cash on Collection

Please pay as soon as possible after winning an auction, as that will allow us to post your item to you sooner! 

​​​​​​​All orders come with a Vat invoice.

We offer FREE shipping on all orders!

Your order will be dispatched the same working day when ordered before 2pm (receiving payment) (Monday-Friday) and you should expect to receive the next working day. (Monday-Friday)

Weekend order along with public holiday's will be dispatched the following working day.

All orders placed over the Christmas Holiday will be dispatched in the new year.

In the very unlikely event that your item is lost or damaged during post, then WE are responsible and will issue either a full refund or replacement.

We use DPD and Parcel Force along with a pallet company for larger orders.

If you are not 100% satisfied with your purchase, you can return the product and get a full refund or exchange the product for another one.

You can return a product for up to 60 days from the date you purchased it.

Any product you return must be in the same condition you received it and in the original packaging. Please keep the receipt.

Uponor, Polypipe, Warmup, UFH Direct, Screwfix, The Underfloor Heating Store, Prowarm, Ambient, Ambivent, Reliance RWC, Reliable, PSW Trade Suppliers, The Underfloor Heating Company, Sheilds Trading Underfloor Heating,  Plumb Nation, Nu-Heat, John Guest, Omnie, Solo Heat, Wavin, Danfos, Devi, Rayotec, Demister, Demista, Heatmiser, Prowarm, Underfloor Heating Express, Warmer, Grundfos pums UPM3, ups2, Wilo, Ecocirc, Heating Master Store, VPS Trading, Living Heat Underfloor Heating, water underfloor heating kit, insulation, thermostat, single zone water underfloor heating kit, water controller, neo stat, neostat v2, neohub, Neo Hub, neoplug, uh-8 wiring centre, uh-4, uh-8-rf, DS-Setback, water underfloor heating cost, system, Electric Underfloor Heating 150w 200w