Tekmar 268 nine stage boiler & DHW / set point control, out door reset, circulator pump control, boiler demand for space heating loads, DHW demand for DHW loads, setback input for energy savings, 0 - 10 vdc input signal, test sequence to insure proper component operation, combustion air damper control, outdoor air temperature sensor, supply water temperature sensor and return water temperature sensor