Seymour Duncan AHB-1s Blackouts Active Humbucker  Pickup Set
Nickel Covers
Item Number 11106-32-Nc
Brand New with Full Warranty

Free USPS Priority Shipping

Summary
A set of our active Blackouts humbuckers will turn any guitar into a heavy metal behemoth.

Description
This is a neck and bridge set of our original high-output active Blackouts humbuckers. 
The perfect choice for metal players looking for warm complex chording and singing leads, the original Blackouts neck practically cries out for two-handed shred and thick rhythm playing.
Its extended frequency response and organic feel make this a great humbucker for those who demand both responsiveness and the true tonal character of their guitar to shine through.

The original Blackouts bridge humbucker delivers all of the power and full bodied punch that todays metal players demand from an active pickup. You get the high output signal level of an active pickup, with more of an organic feel and open tonal response that allows the character of your guitar to come through. The treble and bass response is extended beyond the range of traditional active pickups, and has been carefully balanced with a slightly scooped midrange for the perfect crunch. 

This pickup excels at screaming pinched harmonics and hyper-speed riffage with responsive dynamics across the entire fretboard.

Comes with pots, hardware, quick-connector cables, capacitor (active pickups require a special cap value), output jack, battery clip, and wire needed for installation. 

If your guitar already has active pickups with quick-connector cables installed, you should be able to simply unplug them and plug in your Blackouts.


Welcome to Pilgrims Projects

All items come with a 30 day money back guarantee, so your purchase is risk-free.  

I have been a musician for over 40 years, and know that quality items can greatly help both your sound quality and musical enjoyment. Using Seymour Duncan items myself in my '52 reissue Tele, and other guitars, I can find the tone I am looking for.  With the 30 day exchange, if you don't like the sound, you can send it back to me and try something else from Duncan, or get your money back.  Plus, with the one year warranty from Duncan, you are covered should a failure occur.  

That's a pretty good deal.

Hopefully, I can be of assistance in your pursuit of great items that you will enjoy for years to come.  Your satisfaction is top priority, and I will do everything in my power to make your purchase a worthwhile experience.

Questions?  
Drop me a note here on eBay

Thanks Again,
John