DESCRIPTION: Application: Threading steps: 1. Insert the heat pipe into the barrel tray hole 2. Put the glue thread into the thread stop wheel first, then thread the lead needle 3. Pass the lead pin into the top hole of the heat pipe until the lower end exposes the lead pin 4. Clamp the exposed pin end and pull it down 5. The glue line is pressed by the bottom of the pressure roller Operating steps: 1. Lightly lift the machine and lightly press the roller on the surface of the veneer. The main heat pipe does not touch the veneer. 2. Keep the pressure roller and the roller at the same horizontal line, push down and push forward 3. After completion, please do not lift the machine and pull it back. Please follow the instructions to automatically cut off. 4. After cutting, the line is caught by the stop wheel. If you need to operate, pull the glue line back to the rubber pressure wheel. Package Included: 2x J6 Splicing Threads NOTE: we don't ship the item to PO BOX address, and we only ship the item to English address, so please leave us your physical English address when you pay. |