EMG Jim Root Deamonum Set
Black
Item Number 7193.00
Brand New with Full Warranty
Free USPS Priority Shipping
Jim Root, a long time user of the EMG 81/60 combo, began the process of developing a signature set well over three years ago. After trying various prototypes Root was inspired by a set of modified Retro Active pickups to tailor his tone. He settled on a set that gave him everything he loved from the 81/60 with the added benefits and versatility of the Retro Active design.
Make sure to check the instructions
for pickup measurements before purchasing to compare your existing
pickups with EMG models.
Package Includes EMG's exclusive Solderless Install System:
2 VOLUME CONTROLS (25K)
2 TONE CONTROLS (25K)
1 two pickup in/out buss
1 stereo output jack
1 battery buss
2 pair mounting screws and springs
2 pickup cable 15"
4 connect cables
1 output cable
1 battery cable
EMG warranty:
All EMG Pickups and accessories are warranted for a period of two years. This warranty does not cover failure due to improper installation, abuse or damage. If upon examination the pickup is determined to be defective, a replacement will be made. Warranty replacement products are covered by this same warranty.
Welcome to Pilgrims Projects
When it comes to active pickups, EMG is the go-to for countless players. That is why we are proud to carry the EMG line!
Because purchasing a guitar pickup to achieve a certain sound can be tricky, all items come with a 30 day money back guarantee if you don't like the sound. So, essentially your purchase is risk free.
That's a pretty good deal.
Hopefully, I can be of assistance in your pursuit of great items that you will enjoy for years to come. Your satisfaction is top priority, and I will do everything in my power to make your purchase a worthwhile experience.
Questions?
Drop me a note!
Thanks Again,
John