LEAD TIME (2-3 WEEKS)

It might be quicker than that, but we want you to be aware. all our products are handmade to order by us here in the UK.

 

Key Features.

 

DB LEVELS TESTED AT 5500 RPM (static tested using the same method as track events)

With our brand-new design and baffle system DB’s are now Controllable

GP-R3R = 104–110 + DB’s


Kit content