Seymour Duncan SP90-1b Vintage P90 Soapbar Bridge
Black
Item Number 11301-06-B
Brand New with Full Warranty
Free USPS Priority Shipping
Summary
Our vintage correct recreation of the 1946 Gibson single-coil with all of the midrange grittiness that makes a P90 bridge pickup so special.
Description
The dual alnico 5 bar magnets, and the short, wide bobbins give the P90 its unique tonal character with a powerful midrange and higher output than most other types of single coils.
In the bridge position, this pickup has sparkly mids that really give it a gritty, open tone. Chords have a nice harmonic bloom, and single notes are glassy and up-front.
This pickup is a drop-in replacement for any traditional Gibson-sized P90 soapbar route.
Pair with our Vintage P90 neck for a perfectly matched set.Our Vintage P90 is wound with plain enamel wire, and we add extra mojo by winding them on the same Leesona winder that was used in the 1950s in the old Gibson factory.
Comes with vintage braided single-conductor hookup cable and is wax potted for squeal free performance.
Welcome to Pilgrims Projects
All items come with a 30 day money back guarantee, so your purchase is risk-free.
I have been a musician for over 40 years, and know that quality items can greatly help both your sound quality and musical enjoyment. Using Seymour Duncan items myself in my '52 reissue Tele, and other guitars, I can find the tone I am looking for. With the 30 day exchange, if you don't like the sound, you can send it back to me and try something else from Duncan, or get your money back. Plus, with the one year warranty from Duncan, you are covered should a failure occur.
That's a pretty good deal.
Hopefully, I can be of assistance in your pursuit of great items that you will enjoy for years to come.Your satisfaction is top priority, and I will do everything in my power to make your purchase a worthwhile experience.
Questions?
Drop me a note!
Thanks Again,
John