Seymour Duncan Dino C Blackouts 7 String Active Mount Pickup Set
Item Number 11106-49-B
New in Box Full Warranty
Free USPS Priority Shipping
Summary
Recommended for all metal and heavy rock styles.
Description
The Retribution pickups were designed with Dino Cazares of Fear Factory and Divine Heresy to provide the essential attack, clarity and increased headroom. They feature a specially tuned preamp with just the right amount of gain, enhanced attack definition and maximum string clarity. Like the standard Blackouts series and Mick Thomson EMTY Blackouts, they maintain an organic open sound that isn't sterile but instead is huge and powerful with a lower noise level and an increased dynamic response compared to other active pickups.
“It has a much more richer tone that’s more evenly voiced so the low string is not fighting with the high string. It’s a very crunchy sound, great for low tunings. It has more articulation in the pick attack and the distortion has less unwanted noise and compression.” -Dino Cazares
complete setup
Retribution comes with wiring schematics and all necessary mounting hardware including pots, stereo jack, and battery clip. They are available separately as neck and bridge models or as a complete calibrated set for 7 string guitars (passive and soapbar sized) and bridge only for 8 string guitars (soapbar sized).
Welcome to Pilgrims Projects
All items come with a 30 day money back guarantee, so your purchase is risk-free.
I have been a musician for over 40 years, and know that quality items can greatly help both your sound quality and musical enjoyment. Using Seymour Duncan items myself in my '52 reissue Tele, and other guitars, I can find the tone I am looking for. With the 30 day exchange, if you don't like the sound, you can send it back to me and try something else from Duncan, or get your money back. Plus, with the one year warranty from Duncan, you are covered should a failure occur.
That's a pretty good deal.
Hopefully, I can be of assistance in your pursuit of great items that you will enjoy for years to come. Your satisfaction is top priority, and I will do everything in my power to make your purchase a worthwhile experience.
Questions?
Drop me a note here on eBay
Thanks Again,
John