Click images to enlarge
Description
As pictured. As pictured. Used replacement large boiler dome. Two ways to install- if boiler halves has some separation: 1. Enlongate the two holes toward each other with small rat tail file (might add glue for added holding). 2. Break/file off the two tabs and epoxy glue. Shipping wt 2-3 oz.. . Good Luck! See my other auctions.
About Us
now 86 years old and need to reduce AF cllection. Also hve 55 Desoto, 42 Ply, 52 Ply.