Brand new thin plastic. : 853449004005.


The map protractor is a great tool for anyone using topographic maps. Find 4, 6, and 8 digit grid coordinates using the UTM or MGRS, find aziumths, measure straight and road distances, and much, much more. Order one for yourself or thousands for your unit today! Features & details


Printed on 30 mil plastic stock with a protective coating - Clear Lexan Plastic hard to scratch


3 scales: 1:25,000 x 1km/1:250,000 x 10km; 1:50,000 x 1km; 1:100,000 x 1km


Military Graphic Training Aid Coordinate Grid Reader & Protractor, GTA


: The first grid line north of the south-west corner of the Columbus map is labeled 3570000m N. This means its false northing (distance north of the equator) is 3,570,000 meters. The principal digits, 70, identify the line for referencing points in the northerly direction. The smaller digits, 35, are part of the false coordinates and are rarely used. The last three digits, 000, of the value are omitted. Therefore, the first grid line east of the south-west corner is labeled 689000m E. The principal digits, 89, identify the line for referencing points in the easterly direction


(3) Grid Coordinate Scales. The primary tool for plotting grid coordinates is the grid coordinate scale. The grid coordinate scale divides the grid square more accurately than can be done by estimation, and the results are more consistent. When used correctly, it presents less chance for making errors. GTA 5-2-12, 1981, contains four types of coordinate


(a) The 1:25,000/1:250,000 (lower right in figure) can be used in two different scale maps, 1:25,000 or 1:250,000. The 1:25,000 scale subdivides the 1,000-meter grid block into 10 major subdivisions, each equal to 100 meters. Each 100-meter block has five graduations, each equal to 20 meters. Points falling between the two graduations can be read accurately by the use of estimation. These values are the fourth and eighth digits of the coordinates. Likewise, the 1:250,000 scale is subdivided in 10 major subdivisions, each equal to 1,000 meters. Each 1,000-meter block has five graduations, each equal to 200 meters. Points falling between two graduations can be read approximately by the use of estimation.


(b) The 1:50,000 scale (upper left) subdivides the 1,000-meter block into 10 major subdivisions, each equal to 100 meters. Each 100-meter block is then divided in half. Points falling between the graduations must be estimated to the nearest 10 meters for the fourth and eighth digits of the coordinates.


(c) The 1:100,000 scale (lower left) subdivides the 1,000-meter grid block into five major subdivisions of 200 meters each. Each 200-meter block is then divided in half at 100-meter intervals


Comes as pictured

Thanks for looking