Description:
  1. Clean the base surface before construction to ensure that the base surface is dry and free from dirt. If there are cracks (more than 2 mm), it is recommended to repair with seal ant first, and then use waterproof agent.
  2. Spray or brush the product directly on the surface of ceramic tile, floor tile, wall tilecement, etc. “Wait for the product to penetrate into the base course. After a few minutes, when there is no liquid on the surface, spray twice or three times to enhance the effect. The waterproof layer can be formed after curing for 24- 48 hours, and the waterproof layer will be stronger with the time delay.

Features:


Package Includes:

1 x Waterproof Coating

1x brush