EM121 is supplied as a two component mix complete with thinners. Equal quantities of component A & B are supplied with each available pack size (Easy mix ratio 1:1 by volume).
Starter and Chassis packs are supplied with 250ml of Epoxy thinners 5Ltr pack sizes are supplied with 1Ltr of Epoxy thinners.
EM121 is typically very viscous and requires a correct mixing procedure and thinning with the supplied thinners
Product Description |
2 Pack modified High Build Epoxy chassis renovation paint. |
Pack Description |
Starter pack 1.25 Ltr Covers approx. 5 m2. 500ml comp A + 500 ml Comp B + 250 thinner Chassis Pack 2.25 Ltr Covers approx. 10m2. 1 Ltr comp A + 1 Ltr comp B + 250 ml thinner 6 Ltr Pack Covers approx. 25m2. 2.5 Ltr Comp A + 2.5 Ltr Comp B + 1 Ltr thinner 5 Ltr Custom made colour covers approx. 20 m2. 2 Ltr comp A + 2 Ltr Comp B + 1 Ltr thinner |
Application temperature |
Can be applied to steel as low as - 5 c. The steel must be at least 3 degrees above the current dew point. (see Dew point calculator on this site) |
Thinning |
Use only the Epoxy thinner supplied, this from 5 - 20% max. |
Application |
Brush or Spray |
Spraying |
Minimum 1.8 nozzle or a HB primer set up test atomisation on a test panel first. Viscosity will vary i.e. thicker in colder temperatures. All data is at 20c. |
Pot Life |
Pot Life: You have around 2.5 hours pot life once mixed (at 20c) longer at colder temperatures. |
Shelf Life |
If stored upside down in a dry store at around 20 c the product will last unmixed for a year, officially the shelf life is 12 months. |
Disposal |
Allow the mix to cure in your mixing cup and throw away as dry waste. |
Cleaning |
Clean up with standard thinner or gun ash, do not thin the coating with standard thinner as this will affect the paint cure. |
Safety |
Use in a well-ventilated atmosphere, use a respirator face mask when spraying or brushing in an enclosed space. See SDS on data sheet section. Wear suitable protective clothing, gloves and eye protection |