RailroadTreasures offers the following item:
 
Trains Illustrated Magazine Bound Volume 12 1959
 
Trains Illustrated Magazine Bound Vol. 12 1959
" A4 ", 107 m.p.h. with an  105
ABERYSTWYTH-CARMARTHEN BRANCH
OF THE W.R., THE 39
Accident Reports, etc.:-
Chinley, L.M.R.  7
Lunan Bay, Sc.R.  180
Anti-Ra:lway Prejudice, The  517
Attack and Counter-attack  405
Automatic Trains in Russia  293
BANBURY-BUCKINGHAM RAILCAR
EXPERIMENT, THE 594
BANBURY, NEW STATION AT 6, 294
Barleng Flyover Progress 179, July, 527
Barrow-in-Furness, New Station at  66
Bethnal Green Alterations  236
BETWEEN SKIPTON AND AIS GILL ...480, 628
Bevercotes Colliery, New Branch to  47
Beyer-Garratts, The L.M.S. 52, 122
BRANCH LINE CLOSURES :-
Aberfoyle Branch, Sc.R.  577
Abermule-Kerry, W.R.  179
Acton Town-South Acton, L.T.E.  179
Balloch-Stirling, Sc.R.  577
Banbury-Buckingham, L.M.R. 463, 518, 594
Bedford-Northampton, L.M.R.  463
C.I.E. Branches  578
Cavan & Leitrim 119, 412, 570
Clarboro' Junc.-Sykes Junc., E.R.  366
Donington-on-Bain to Wragby, E.R.  4
Dornoch-The Mound, Sc.R. July
Essend.ne-Stamford, E.R.  293
Fortrose-Muir of Ord, Sc.R. July
Greetland-Stainland, N.E.R. 293, 518
Hawes-Garsdale, N.E.R.  179
Holmfirth-Brockholes, N.E.R.  518
Hull & Barnsley Line  63, 234
Luton-Dunstable, L.M.R.  463
M. & G.N. Line, E.R.  63
Monmouth-Chepstow, W.R.  3
Queensbury-Keighley, N.E.R. 179, 293
Ross-Monmouth, W.R.  3
Spilsby-Firsby, E.R.  4
Swansea & Mumbles Rly.  577
Th'rsk-Melmerby, N.E.R.  518
Worth Valley, N.E.R. 293, 463, 518
Branch Line News 463, 518
Branches Under Sentence  181
BRISTOL-FROME BRANCH OF THE
W.R., THE 473
Bristol, New Diesel M.u. Schemes  103
" Bristolian ", The 71 m.p.h.  289
BRITAIN'S BIGGEST COACHES  141
BRITISH ASSOCIATION LOOKS
AT BRITISH RAILWAYS, THE 545 BRITISH RAILWAYS :-
1959 Begins Badly  234
Businessmen and B.R.  346
Class " 9 " 2-10-0 on Test  502
Commonwealth Bogies on B.R.
Rolling Stock July, 349
Computer for B.R., Unique  4
" Condor " Freight Service 175, 568
Cost of Transport  346
Dieselisation Reviewed July
Economies are Increased  1
Electric Locomotive Numbering Scheme459
Fares Structure, the New 573
Freight Handling, Modern  5
Motive Power Policy  516
New Year Message from Sir Brian Robertson 2
Passenger Traffic in 1958  175
Passenger Traffic Buoyant  3
Paying for the Commuter  457
Railway Workshops Threatened July
RE-APPRAISAL OF THE MODERNIS-
ATION PLAN, THE  345, 401, 406
Results in 1958  388
Rolling Stock, New 3, 290
Safety in 1957  175
Sleeping Car Reservations,
Revised Booking Arrangements 179
SNOW FIGHTING EQUIPMENT  96
State of British Railways...1, 48, 169, 171, 173, 342
SUMMER TIMETABLES, THE July, 454
Timetable Maze, The July, 454
Track Recording Coach, The New  403
Withdrawals of Service  3
BRITISH RAILWAYS CLASS " 9 "
2-10-0's, THE 418, 555, 626
Broxbourne, New Station at  616
Buffet-Lounge Cars of " Flying Scotsman "
Converted 325
C.I.E. Service Withdrawals 47, 578
CALLINGTON BRANCH, FOCUS ON THE 152
CAMBRIAN SCRAPBOOK  38
Cambridge, New Diesel M.u. Schemes  103
Camping Coach,' Pullman  577
CANADA, THE RAILWAYS OF 496, 550
" CARDEANS " OF THE
CALEDONIAN, THE 309, 456
CARDIFF, RESORT FOR
RAILFANS 202, 262, 342
Carlisle Yard, The New  402
CAVAN & LEITRIM,
THE END OF THE 412, 570
CENTRALISED TRAFFIC CONTROL,
NEW DEVELOPMENTS IN 613
Chelmsford Station Modernisation  606
Cheltenham Lansdown Layout 399, 516
Coachmen's Corner 404, 523
COAL TRAFFIC OF THE N.E.R.  272
COLCHES TER-CLACTON-WALTON
ELECTRIFICATION, OPENING OF THE 306
Colchester Station Remodelling  526
" CONDOR " FAST FREIGHT SERVICE 175, 568
" Coronation " Beaver-tails Rebuilt  347
Coventry, New Station at  255
Crewe Works, End of Steam Locomotive
Construction 66
CROSTI AND FRANCO-CROSTI BOILERS
IN WEST GERMANY 421
DIESEL-GENERAL MATTERS :-
B.R. Dieselisation Reviewed July
Bigger Diesels from Swindon  290
Diesels and the Signalman  463
D'esel Design, Simplicity in  234
Diesel Motive Power Policy  516
Diesel Predictability  4
Diesel Traction in the N.E.R.  34
Diesels Disappoint  117
Demisters on Diesels  49
Telephones for M.u. Crews  291
U.S. Trend towards Bigger Diesels  405
DIESEL LOCOMOTIVES :-
1,000 h.p. DIESEL-ELECTRIC Bo-Bo
for E.R.July
1,200 h.p. DIESEL-ELECTRIC Co-Bo
for L.M.R. 12
1,550 h.p. Diesel-electric Bo-Bo for S.R.  352
1,700 h.p. Diesel-hydraulic B-B for W.R.  352
2,000 h.p. Diesel-hydraulic B-B for W.R.  118
2,300 h.p. DIESEL-ELECTRIC 1Co-Col
for L.M.R 295
New Orders for Locomotives 118, 174, 241, 290,
295, July, 352
Shunters Ordered, More  118
" SMALL DELTICS " OF THE E.R.  434
Testing 1,000 h.p. Bo-Bo D8000  443
DIESEL TRAINS, RAILCARS
AND SERVICES :-
Additional Units 174, 290, July
BANBURY-BUCKINGHAM RAILCAR
EXPERIMENT, THE 594 Bedford-Hitchin/Northampton Services Success 106
Diesel on the West Highland  240
East Anglian Workings  108
Glasgow-Ayr Services July
HAMPSHIRE UNITS SUCCESS  330
Inter-City Sets, New 290, July
Inter-City Units and New Developments
at Swindon 529
Liverpool-Wigan Service  119
Malton-Whitby Service  325
Manchester Diesel Schemes  521
Moorgate, By Diesel M.u. to  234
M.u's on the West Highland  291
M.u. SCHEMES, NEW B.R. 103, 389
N.E.R., More Diesel Services  119
Oxted Line Services  235
Pullman Puzzle  290
Railbuses for the W.R.  121
Railbuses, New Wickham  352
Railbus Services, New Scottish  179
ST. PANCRAS-BEDFORD UNITS July, 588
W.R. Pullmans Schedules  404
W.R. Services, More  351
Double Chimney, The First  4
Driver Hoole Retires  456
" DUNALASTAIR 1 " 4-4-0's OF THE
CALEDONIAN 85
" DUNALASTAIRS ", THE LAST OF THE 58
Dundee, New Diesel M.u. Schemes  105
Dundee Tay Bridge, Modernised Station Offices 236
Durham Ox Level Crossing, Lincoln, Closed  606
EASTERN REGION :-
COLCHESTER-CLACTON-WALTON ELECTRIFICATION, OPENING OF THE 306
East London Developments  527
Electric Multiple Units  122
G.E. Buffet Cars, Accolade for  108
G.E. Electrification, The 178, July
G.E. Stock Util; sat:on  64
GREAT EASTERN TIMETABLE TRANSFORMATION, A 22, 171, 230, 287
New C.M. & E.E.  459
Shenfield Units Modified  4
Sunday Changes in East Anglia  64
East Anglia to the Midlands  239
East Anglian Diesel Workings  108
EAST ANGLIAN FREIGHT  84
East Ham, New L.T. & S. Electric M.u. Depot 325
Eastleigh Works Open Day  366
Economies on B.R. Are Increased  1
Edinburgh-Aberdeen in 3 Hours  518
Edinburgh-Inverness Sleeping Car Service  255
ELECTRIC LOCOMOTIVES FOR
KENT COAST SERVICE 123
ELECTRIC LOCOMOTIVES FOR
SWITZERLAND AND THE U.S.S.R. 425
Electric Locomotive Numbering System, B.R. 459
Electric Units for Manchester-Bury Service July
Electric Units from York  293
Elgin-Aviemore Line, New Halts  366
ES SENDINE-STAMFORD BRANCH  292
ESSEX COAST BRANCHES OF
THE G.E. LINE 188
EUROPEAN TRACTION DEVELOPMENTS,
RECENT 195
Euston-Buchanan Street  522
Fares Structure, The New  573
FESTINIOG IN 1958, THE  42
Festiniog Reopening July
Fewer Meals on Wheels  121
Five Trains to Hanoi  579
" Flying Scotsman " Buffet Lounge Cars
Converted 325
Fiat Cars from the Continent
via Dunkerque-Dover Ferry July
FRANCE :-
4-8-2's in Brittany  293
Freight Handling, Modern  5
HIGHEST SUMMIT ON THE S.N.C.F.  196
PARIS-LILLE ELECTRIFICATION, THE 135
Paris-Lille New Electric Trains  404
SPEED PROGRAMME 1959/60 256, 352
Still Faster  533
VIADUCTS, FOUR SPECTACULAR  200
World Speed Record Taken  352
Freight Working, Towards Reliability of ...211f 342
G.C. Line Express Service Discontinuance July, 575
G.E. Line Buffet Cars, Accolade for  108
G.E. Line Electrification, The 178, July
G.E. Line Stock Utilisation  64
G.E. LINE TIMETABLE TRANS-
FORMATION, A 22, 171, 230, 287
G.W. " Dreadnoughts ", The  141
G.N.R. (Ireland) Changes in Working  8
GERMAN FEDERAL RAILWAYS TO-DAY,
THE 379, 514
Germany, High Speed in  138
Giesl Oblong Ejector, The  178, 575
Glasgow Central, Resignalling at  175, 522
Glasgow St. Enoch, Mechanical Booking
Office Installed 106
Glasgow Suburban Electric Units on Trial  366
Glasgow Suburban Events  460
Glasgow Subway New Trains  255
GLOUCESTER, RESORT FOR
RAILFANS 78, 232
GREAT EASTERN " 1500 " CLASS
MEMORIES OF THE 361, 516 570 GREAT WESTERN 2-CYL. 4-6-0s, EARLY DEVELOPMENT OF THE 428
Great Northern Line, Development on the  160
Grimsby & Immingham Tramway Reprieve July, 402
Groombridge, S.R., New Signal Box  106
Guards Equipped with Ticket Issuing
Machines, Speyside Line 325
Hadley Wood Tunnels, New Down Slow
Line Opened 255
HADLEY WOOD WIDENING
COMPLETED July, 456
Halesowen Joint Line, The  53
HAMPSHIRE DIESEL ELECTRIC'S
SUCCESS 330
HANOVER, MODERN SIGNALLING AT... 386
Headcodes, The New  522
HELENSBURGH, RAILWAYS TO: A PRE-ELECTRIFICATION RETROSPECT 540, 590
Hertford North Branch Services  234
Hetton Colliery Ralway Closed  579
Highlands, Economy in the July
High Speed in France 256, 352, 533
High Speed in Germany  138
HITCHIN COLLISION, AFTERMATH OF
THE : CONTROL IN ACTION 465, 628
HOME WITH THE MILK  154
HOPE VALLEY ROUTE, THE  26
Huddersfield-London Service  519
HUDDERSFIELD-PENISTONE LINE AND
ITS BRANCHES, THE 248, 400
Huddersfield, Resignalling at  75
Injectors, Footplate Talk on  51
JAPAN, SUPER-RAILWAY PLANNED FOR 313
" Jones Goods " Restored  464
Kent, Final Stage in  235
Kent, Stage Two  463
KENT COAST, THE SOUTHERN IN
TROUBLE ON THE 212, 288, 341 KENT COAST MOTIVE POWER,
PREPARATIONS FOR THE July
KENT COAST, THE MODERNISED  374
Kent Coast Service, 4-Car Express Units for  304
King's Cross, Train Information by T.V.  237
Kitmaster Locomotive Models  259
L.M. REGION :-
25kV ELECTRIFICATION, PROGRESS
REPORT 9
Bedford-Northampton/Hitchin Diesel Services'
Success 106
Cut Price First Class Fares  47
Drive for Freight  160
Electrificat. on Speeded Up 61, 171
G.C. Express Service Discontinuance July, 575
Goods Depots for Sundries Traffic  366
LIVING WITH L.M.R.
LOCOMOTIVES 146, 287 342
New Look in L.M. Stations  66
Passenger Plan, The New 233, July, 454, 568
Reorganisation 48, 107, 230
Saturday Night Expresses, North and
Midlands to West Country 106
Toton Yard, Two-way Telephones  106
L.T.E.:-
East London Developments  527
The London Peak  458
Northern Line Automation  a
Progress  616
L.T. & S. Line, Erection of Catenary  106
L.T. & S. Line, Modernisation Progress  527/8
L.T. & S. Line, New Electric M.u. Servicing
Depot 325
Landlord Hires a Diesel  460
Leeds Central, The End of  235
Leeds City, The New 348/9, 519
LETTERS TO THE EDITOR ...48, 107, 169, 230. 285, 341, July, 399, 454, 514, 568, 626
Locomotive Models, Kitmaster  255
LOCOMOTIVE RUNNING PAST AND PRESENT 14, 49, 71, 130, 182, 242, 298, 341. July, 367, 430, 475, 534, 568, 607 LOCOMOTIVE STOCK CHANGES 60, 116, 168. 228, 284, 339, July, 399, 453, 513, 567, 624
M. & G.N. Line Closure 63, 239, 24C
M. & S.W.J., Slow Death of the 399, 516
M.S.J. & A.R.-A Postscript 106, 342
M.u. With a Difference  67
Manchester-Bury Service,
New Electric Units for July
Manchester Diesel Schemes  521
Manchester (London Road) to St. Pancras ...521, 578
Manchester (Oxford Road) New Station  66
Manchester (Piccadilly)  578
MANCHESTER SHIP CANAL RAILWAY,
THE 489, 626
Melton-Cromer Service Revised  235
" Met ", Modern:sat:on on the  255
MIDDLESBROUGH-NEWCASTLE ROUTE
OF THE N.E.R., THE 354, 436, 572
" Midland Pullman ", The  574
MILK SERVICES ON THE W.R.  154
MIDLANDS-EAST COAST HOLIDAY
TRAFFIC 586
Misrepresentation, A Bad  67
MIXED TRAFFIC  260
MIXED TRAFFIC AMONG THE FELLS  416
MOODS OF A PRINCESS  614
MOTIVE POWER MISCELLANY ...53, 110, 162, 221, 277, 332, July, 390, 445, 504, 560, 617
Motor Luggage Vans for the S.R.  523
N.E. REGION :-
COAL TRAFFIC OF THE N.E.R.  272
Day-Line Diesel Runabout Tickets  255
Diesel Traction in the N.E.R.  34
RELAYING WITH LONG-WELDED
RAILS 68
Singling of Lines Proposed  293
" Tees-Thames " Link  47
Widening North of York  519
NEWCASTLE-UPON-TYNE, NEW
SIGNAL BOX 327 NEWS 1N BRIEF 47, 106, 179, 255, 325, July, 366, 526, 606 New Year Message to " T.I." from
Sir Brian Robertson 2
No Connection with Next Door  400
Norfolk, New Spur in  523
North British Locomotive Co., Loan for  177
NORTH BRITISH LOOK, THE  503
NORTH MIDLAND ROUTE, THE 25, 52
North Staffordshire Modernisation, The  349
NORTH WALES COAST MAIN LINE, THE 126 NORWICH CITY COMES UP FOR THE CUP 267 NOTTINGHAM-KETTERING LINE OF
THE L.M.R., THE 318, 455
Notting Hill Gate Station, New L.T.E.  255
OLD FRIEND, AN, THE 9.7-  139
Oxford-Cambridge Reprieve  402
OXFORD, RESORT FOR RAILFANS  596
Oxted Line Diesel Service 235, 462
PACIFICS ON THE LANCASHIRE
& YORKSHIRE 316
PARIS-LILLE ELECTRIFICATION, THE 135
Paris-Lille New Electric Trains  404
PASSENGER SERVICE,
DISCONTINUANCE OF i-
Beccles-Yarmouth, E.R.  577
Bristol-Frome-Radstock, W.R. 234, 293, 577
Crewe-Northwich, L.M.R. 463, 577
Croxley Green Branch, L.M.R. (Sundays)  325
D.N. & S. Line, W.R.  463
Guide Bridge-Oldham (Clegg Street), L.M.R 293
Holmfirth Branch, N.E.R. 463, 577
Honeybourne-Cheltenham, W.R.  577
Inverness-Tain Intermediate Stations, Sc.R.  July
Kettering-St. Ives, L.M.R.  293
L.M.R. Passenger Plan Implications 233, July, 455,
568
M. & S.W.J.R. 3, 399, 516
Newbury-Lambourn, W.R.  578
Newton Abbot-Moretonhampstead, W.R.  179
Northampton-Blisworth/Market Harborough,
L.M.R. 293
Plymouth-Brent Intermediate Stations, W.R. 3, 179
Wallingford Branch, W.R.  234
Wellingborough-Higham Ferrers, L.M.R.  293
Paying for the Commuters  457
PERTH, THREE WAYS TO  246
Photographers' Excursion, Doncaster
to Betws-y-Coed 235
Plymouth, Modernisation at  122
" POTTERIES EXPRESS ", " T.I."
EXCURSION July
Public Servant or Free Agent ?  62
Pullman Camping Coaches  577
Push-and-Pull at 80 m.p.h. in Switzerland  296
Push-and-Pull in West Germany  515
Push-and-Pull Possibilities  458
RAILS, RELAYING WITH
LONG-WELDED, N.E.R. 68
Rail-Rovers Again  235
" Railvan ", New Light on the  546
Railway Preservation Societies ...286, July, 456, 571
Railways, Support for the 109, 232, 517
Railway Workshops Threatened July
READING ON RAILWAYS, NEW 37, 172, 232, 259, 271, 329, 400, Nov. vii, 624
Record Review  572
Redundant Main Lines 169, 175, 285
Resignalling at Barnes and Brixton, S.R.  305
RESORTS FOR RAILFANS :-
CARDIFF 202, 262, 342
GLOUCESTER 78, 232
OXFORD  596
Restaurant Car Meals, Increases in Charges  121
Riding of S.R. Multiple Units  627
Road v Rail 399, 571, 628
" Robin Hood ", New Named Tran,
Nottingham-St. Pancras 179
Rolling Stock for B.R., New 3, 290
" ROYAL SCOTS ", THE LIVELY ...146, 287, 342
Russia, Automatic Trains in  293
RUSSIA, ELECTRIC LOCOMOTIVES FOR 425
SCOTTISH REGION :-
Diesel Railbus Services, New 179, 389
Economy in the Highlands July
Ed:nburgh-Inverness Sleeping Car Service 255
Elgin-Avremore Line, New Halts  366
Fre'ght Scheme Extension  349
Glasgow Central, Resignalling at 175, 522
Glasgow St. Enoch, Mechanical Booking
Office Installed 106
Glasgow Suburban Electric Units on Trial ... 366
Reorganisation  119
SOUTHERN REGION :-
S.R. Tells the Public  174
Christmas Travel  108
Corridor Push-and-Pull Sets  606
Diesel and Electric News  7
Express Units for Kent Coast Service  304
Groombridge, New Signal Box  106
KENT COAST MOTIVE POWER,
PREPARATIONS FOR THE July KENT COAST, S.R. IN TROUBLE
ON THE 212, 288, 341
Motor Luggage Vans  523
Riding of M.U's.  627
Rolling Stock  349
Summer Timetables  303
Train Cuts, Morc  62
Safety on Railways-A Bad Misrepresentation 67
School Charter of Scottish T.V. Train  179
SCOTTISH INDUSTRIES EXHIBITION,
SEPTEMBER, SPECIALS TO THE 582 Seamer, Projected Spur Between York and
Bridlington Lines 106, 231
SHEFFIELD INTERLUDE  30
Sheffield-York D.esel M.u. Service  105
SHENFIELD NEW DEPARTURE
INDICATORS 65
Signal Boxes, Visits to  342
SKIPTON AND AIS GILL, BETWEEN 480, 628 Sleeping Car Reservations, Revised Booking
Arrangements 179
Sleeping Car Service, Paddington-Milford
Haven 106, 121
Sleeping Car Services, The Shortest  288
Slip Coaches, More W.R.  288
SNOW FIGHTING EQUIPMENT, B.R.
NEED MODERN 96, 231
SOUTHAMPTON-GATEWAY TO THE
OCEAN 88, 232
SOUTH WEST SCOTTISH SCRAPBOOK  372
Speyside Line, Guards Equipped with Ticket
Issuing Machines 325
" Starlight Specials ", Resumption of  179
STEAM AT SCARBOROUGH  144
STEAM ON THE EASTBOURNE LINE  238
Storm of the Century, The  49
SUMMER TIMETABLES, THE B.R. July, 454
Sunday Changes in East Anglia  64
Swansea First Stop  121
Switching Out Signal Boxes  441
SWITZERLAND, NEW HIGH HORSE-
POWER ELECTRIC LOCOMOTIVES 425
Switzerland, Push-and Pull at 80 m.p.h.  296
Switzerland, Railway Museum 464, 628
SYKES LOCK AND BLOCK 45, 230, 288
T.E.E. Services, New Electric  270
" T.I." EXCURSION, THE " POTTERIES
EXPRESS " 180, July
T.P.O's, NEW WOLVERTON-BUILT STANDARD, FOR W.R. July 580/1 TALKING OF TRAINS 1, 61, 117, 173, 233, 289,
Telephones for M.u. C
Jurews  91ly, 3273
45, 401, 457, 517, 5
TEMPLE MILLS YARD, THE NEW  '  July
Tenby Station Reconstruction  606
Tilbury to Avonmouth  462
Timetable Maze, The July, 454
Toton Up Yard, Installation of Two-way
Telephony 106
Track Recording Coach, New B.R.  402
Train Heating Problems  460
Train Services in the S.E. Midlands  399
Train Timing July
Transport System, An Integrated ?  231
U.S.A.:-
Bigger Diesels Trend  405
M.u. With a Difference  67
Rail Speed Drops July, 352
U.S.S.R., NEW HIGH HORSEPOWER
ELECTRIC LOCOMOTIVES 425 U.T.A., Locomotives transferred from N.C.C.
Services to G.N.R 325
Ulster Report  559
WESTERN REGION :-
Diesel Pullmans Schedules  404
Diesel Services, More  351
Flash-butt Welding Depot, Hookagate  606
New General Manager  233
Paddington-Milford Haven Sleeping Car
Service 106, 121
Plymouth, Modernisation at  122
Slip Coaches, More  288
Trains Booked at 58 m.p.h. and Over,
Summer 1959 351
Winter Service  462
West Highland Line, A Diesel on the  240
West Highland Line, M.u's on the  291
Wickham Railbus, New  352
Widening North of York  519
Winter of Discontent 173, 342, 399
Winter Timetables, The 460, 532, 584
WORCESTER INDUSTRIAL LINE, A  366
WYE VALLEY SOUVENIR  76

All pictures are of the actual item.  There may be reflection from the lights in some photos.   We try to take photos of any damage.    If this is a railroad item, this material is obsolete and no longer in use by the railroad.  Please email with questions. Publishers of Train Shed Cyclopedias and Stephans Railroad Directories. Large inventory of railroad books and magazines. Thank you for buying from us.

Shipping charges
US Shipments:  Ebay will add $1.25 each additional items, there are a few exceptions.    
Ebay Global shipping charges are shown. These items are shipped to Kentucky and forwarded to you. Ebay collects the shipping and customs / import fees.   Refunds may be issued if you add multiple items to your cart and pay with one payment.    For direct postage rates to these countries, send me an email.   Shipping varies by weight.

Payment options
Payment must be received within 7 days. Paypal is accepted.

Terms and conditions
All sales are final. Returns accepted if item is not as described.  Contact us first.  No warranty is stated or implied. Please e-mail us with any questions before bidding.   

Thanks for looking at our items.