• About this item

    • 【For Hayward replacement part】IDXL2ICB1931 Integrated Control Board fits for Hayward H-Series Low Nox Induced Draft (IDL / IDL2).H250IDL1, H250IDL2, H250IDPL1, H250IDPL2,H300IDL1, H300IDL2, H300IDPL1, H300IDPL2,H400IDL1, H400IDL2, H400IDPL1, H400IDPL2.
    • 【Direct Replacement】If your old Hayward bathtub has been used for many years, the control module has a heating failure. It is recommended that you replace it directly. This product meets or exceeds OEM specifications and has been factory tested. Old parts can be replaced directly, safe and reliable, and stable performance!
    • 【Efficient and safe operation】 without any other complicated settings, the temperature of the 850 gallon swimming pool can rise by 35 degrees in less than an hour. By reducing the running time of the pump and improving the heating efficiency, the cost is saved by up to 22%. Believe me, it is the ideal choice for you to be safe and reliable.
    • 【High quality materials】 IDXL2ICB1931 integrated control board is made of the latest upgraded materials, with stable performance and excellent moisture resistance. Reliable use and longer service life. It is more convenient to use and install. Note: For swimming pool and spa heaters manufactured after September 2004.
    • 【100% Satisfaction Guarantee】 Your satisfaction is our top priority, We strive to provide customers with quality services.If you're not 100% satisfied with this tool set, simply return it for a full refund in 30 days. Premium Support & 12-Month Warranty.



Product Description

IDXL2ICB1931 Integrated Control Board Replacement

 IDXL2ICB1931

IDXL21CB1931 H-SERIES Low NOX INTEGRAED CONTROL BOARD

  • Electrical Connections:
  • The heater comes factory-wired for use with a 240 VAC,60Hz, field power supply.To convert the heater to 120 VAC,6O Hz, remove the 240 VAC Voltage Selector Plug from thereceptacle on the Fuse Board. Locate the 120 VAC VoltageSelector Plug and install it into the receptacle.
  • All wiring connections to the heater must be made in accor-dance with the latest edition of the National Electrical CodeANSI/NFPA 70, unless local code requirements specify oth-erwise. In Canada, follow csA C22.1-CANADIAN ELEc-TRICAL CODE,Part 1.
  • The heater must be electrically grounded and bonded inaccordance with local codes, or in the absence of localcodes, with National Electrical Code,ANSI/NFPAA 70.The H-Series heater must be installed with the electricalconnections, service entry/remote control, located on theleft side of the heater.
  • Field wiring connections are to be made to the Fuse Boardbehind the control access panel. Connect the field supplywires to the terminal block on the Fuse Board.Connect theground wire to the lug adjacent to the Fuse Board. Tightenterminal screws to 8 in-lbs.

Scope of application

Scope of application

Direct Replacement

If your old Hayward bathtub has been used for many years, the control module has a heating failure. It is recommended that you replace it directly. This product meets or exceeds OEM specifications and has been factory tested. Old parts can be replaced directly, safe and reliable, and stable performance!




We accept PayPal payment only.


Contact us:

If you meet any problem after receiving our product, please feel free to contact us. We will try our best to solve your problem.


Shipping policy:

Orders will be ship out within 1-2 business days after payment has cleared. Orders from Saturdays, Sundays or holidays will process on next business day and will be ship within 24 hours. Please allow 10-30 days for international deliveries. Some shipments could take longer subject to your local customs authorities.


Return & Warranty:

1.We accept 30 days return guarantee for all Items If you are unsatisfied with something you bought from us, you may send it back within 30 days of receipt, and we shall be happy to exchange or refund.

2.Leave a message note in returned box quoting your item(s) ID and buyer ID.

3.All returned products must be in their original condition and packaging. Unfortunately, if products have been assembled or modified, we cannot take them as returns.

4.It is important that we know when your return is expected. Please save your return tracking number or post receipt, and email it to us. We need this in case there are any issues during transit.

5.Refund will only be issued upon our receipt of the returned parcel. Please allow 2 working days for us to process with your return.


About reply:

If you have any questions, please feel free to email our service specialists 24 Hours a Day, 7 Days a Week, and we will reply you ASAP. If no response within 24 Hours, please check the spam of mail box or kindly re-send it to us.


About Feedback:

Please contact us before leaving Netural or Negative feedback if you are not satisfied our service or products. Good communication is helpful for both of us to resolve any problems and issues. We work hard to make sure EVERY CUSTOMER 100% SATISFIED and resolve any problem for you and always leave positive feedback to all our customers.

If you are satisfied with our service, please leave us positive 5-Detailed Selling Rating (DSR). Thanks!