Specifications

This portable LIVING SPACE is built from a used 20FT shipping container (CONEX). This model offers a full bathroom and living space and is designed as a portable unit that can be plugged-in as an RV or boat with a power cord and a water hose.

Each shipping container model can be modified to the customer’s needs like additional windows, doors, exterior color etc.

 

Insulation:

  • Walls and Roof R13

HVAC:

  • Mini-Split System (Heating/Cooling) 9000 BTU, 208-230 Volts, 18 SEER+

Windows and Doors:

  • Windows (Low E, Vinyl frame, white) x 3
  • Entry Sliding Glass Door

Finished walls:

·       Shiplap

Flooring:

  • Vinyl plank

Electrical:

  • Power intake 220 Volts
  • 50Amp Power inlet box
  • Breaker box
  • 4 electrical outlets 110V at living area; 2 electrical outlet 110V at Bathroom
  • 2 ceiling light fixtures at living area; 1 at light fixture at restroom

Kitchenette:

  • Mini fridge (3.2 CU FT, 2 doors)
  • 2-burner cooktop
  • Hood exhaust
  • Butcher block countertops
  • Sink & Faucet

Mini Closet

Bathroom:

  • Tankless water heater
  • Toilet with macerator pump
  • Vanity
  • Shower
Ventilation


Ordering Process

Step 1

Design and Customization

A preliminary design is presented based on the client’s requirements. At this point the client will choose exterior color, locations of door and windows, or any optional items as TV mounts, additional electrical outlets, etc.

 

Step 2

Site Survey

It is recommended to have a survey or sketch of the property to determine the exact location where the container will be installed. This will help with delivery process. This shipping container is recommended to be set over an existent concrete slab or four 2ftx2ft concrete pads.

 

Step 3

Final Design

A final design is discussed and presented. Once the client approves the distribution and technical specifications shown and described in final design provided by Welding to Recycle, a final price is calculated.

 

Step 4

Final Pricing

After final design is approved by the client, a final price is presented. At this point, a 50% deposit is required to place the order.

 

Step 5

Fabrication

Once initial deposit is received and final design is approved, fabrication starts. This process may take up to 45 business days.

 

Step 6

Delivery

When the container is ready for transportation, the other 50% is paid and the unit will be ready to leave via an approved transportation company designated by the client or welding to Recycle (delivery fee not included in the estimate).

 

Step 9

Installation

Your container will be dropped at the designated location either with the trailer or using a crane.

 

Step 10

Move In

Move in into your new Container