Each shipping container model can be modified
to the customer’s needs like additional windows, doors, exterior color etc.
Insulation:
HVAC:
Windows and Doors:
Finished walls: ·
Shiplap Flooring:
Electrical:
Kitchenette:
Mini Closet Bathroom:
|
Design and Customization A
preliminary design is presented based on the client’s requirements. At this
point the client will choose exterior color, locations of door and windows,
or any optional items as TV mounts, additional electrical outlets, etc.
Step 2 Site Survey It is
recommended to have a survey or sketch of the property to determine the exact
location where the container will be installed. This will help with delivery
process. This shipping container is recommended to be set over an existent
concrete slab or four 2ftx2ft concrete pads.
Step 3 Final Design A final
design is discussed and presented. Once the client approves the distribution
and technical specifications shown and described in final design provided by
Welding to Recycle, a final price is calculated.
Step 4 Final Pricing After
final design is approved by the client, a final price is presented. At this
point, a 50% deposit is required to place the order.
Step 5 Fabrication Once
initial deposit is received and final design is approved, fabrication starts.
This process may take up to 45 business days.
Step 6 Delivery When the container
is ready for transportation, the other 50% is paid and the unit will be ready
to leave via an approved transportation company designated by the client or
welding to Recycle (delivery fee not included in the estimate).
Step 9 Installation Your
container will be dropped at the designated location either with the trailer
or using a crane.
Step 10 |