50pcs FTTH Fiber Optic Fast Connector SC UPC Fiber Optic Quick Rapido Connector
Description:
The performance of fiber optic connectors is first of all optical performance, in addition to the interchangeability, repeatability, tensile strength, temperature and number of insertions and removals of fiber optic connectors.
Optical performance: The optical performance requirements of fiber optic connectors are mainly the two basic parameters of insertion loss and return loss.
Insertion Loss is the loss of the effective optical power of the link caused by the introduction of the connector. The smaller the insertion loss, the better. Generally, the requirement should be no more than 0.5dB.
2, interchangeability, repeatability
The fiber optic connector is a universal passive device. For the same type of fiber optic connector, it can be used in any combination and can be used repeatedly. Therefore, the additional loss introduced is generally less than 0.2 dB.
3, tensile strength
For a good fiber optic connector, the tensile strength is generally required to be no less than 90N.
4, temperature
Generally, fiber optic connectors must be able to operate at temperatures between -40oC and +70oC.
5, the number of plugs
Currently used fiber optic connectors can be plugged and unplugged more than 1000 times.
Specifications
Fiber Type: SM
Surface polishing: SC/APC/UPC
Color: Blue
insertion loss: 0.2dB
return loss: ≥60dB
joint endurance: 10Times
Material of shell: ABS
Applications: 2.0/3.0 or FTTH patch cord
Fiber Diameter: 125um
Tensile Strength: >20N
Lock Strength: 0.2dB
Temperature Cycle: 0.3dB
Virbration: 0.2dB
Temperature: -40℃~+80℃
Payment Payment must be completed within 5 days. If you have any problems about payment, please contact us via ebay message.
Delivery details We only ship to confirmed ebay Order addresses. Please comfirm that your Order address is in line with your shipping address.
Please
kindly note that the combined shipping is not provided because the
shipping fee is calculated by weight. Also, the each additional item
means exactly the the same color and size.
It takes about 7-15
working days to US; about 10-30 working days to other countries. Transit
time may be a little delayed because of the bad weather and customs
inspection. If you do not receive your item within 30 working days since
payment finished, please contact us immediately for further assistance.
Contact us We
strive for 100% customer satisfaction! Positive Feedback is very
important to us. If you have any questions, please feel free to contact
us via "Ask seller a question" . We will reply your email within 24 hours.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|