Note: The atomizers' working voltage is DC48V , it needs a transformer (power supply) to make it work.

Please kindly choose the model you want when you make the order ~

Model for choice:
1. Atomizers
2. Atomizers+Transformer
3. Atomizers+Transformer+Bouy
4. Atomizers+Moisture proof power supply
5. Atomizers+Moisture proof power supply+Bouy

Application:
1.Waterscape pool manufacturing fog
2.Spinning humidification
3.Tobacco humidification
4.Mushroom humidification
5.Greenhouse flowers humidification
6. Printed Electronics humidification

Parameter:
1. Atomizers
Voltage: DC48V
Power: 180W
Current: 3.7A
Spray volume: 2.5kg/h
Frequency: 1.7MHZ
Size: 190*91*70mm
Line length: 1.5M
Working water temperature: 5~55°C
Working water level: 9cm (depth greater than 15CM, buoy required)
Working environment: The atomizer must be placed in water to work. Neutral water (tap water, pure water, etc.) and weak acid solution can only be atomized. Do not atomize alkaline solutions, strong acid solutions, and alcohol.

2. Transformer
Working principle: Convert AC220V to DC48V
Input voltage: AC220V
Output voltage: DC48V
Power: 400W
Size: 215*115*50mm
Precautions:
1. The transformer (switching power supply) must not be placed in a damp place. It should not be sealed. Use it in a dry and ventilated place.
2. Nebulizer: Red line is connected to V+, and black line is connected to V-.
3. Plug wire: Yellow wire grounding wire, zero wire Fire wire wire N, L

3. Waterproof power supply
Working principle: Convert AC220V to DC48V
Input voltage: AC220V
Output voltage: DC48V
Power: 200W
Size: 220*70*40mm
Precautions: The power supply should not be placed in water and it should not be exposed to sunlight. The power supply can rain and can be used in a wet place. It is recommended to use it in a cool, ventilated place.

4. Bouy
Work: control the working level of the atomizer
Size: 200*85mm

Instructions
1. When using atomizer, need to be equipped with power supply (output power ≥300W, output voltage is DC64 ±2V); when using ring-shaped jade changer (convert AC220V into AC36V), rectifier plate (convert AC36V into DC48V) .
2. The nebulizer is connected to the power supply. The nebulizer is placed flat in the water. The nebulizer is turned upside down and fully immersed in the water. The electricity can be turned on. When the nebulizer is energized, the water is not taken out. Hold the atomizer upside down to avoid damage.
3. The water level above the atomizer water level sensor is about 1CM, the atomization effect is appropriate, the water is too deep, and it needs to be equipped with a buoy
4. The mist generated by the atomizer needs to be exhausted by the fan to prevent the water temperature from rising due to the retained water in the mist, shortening the life of the atomizer.
5. When multiple atomizers are placed in one container (with an interval not exceeding 1M), the quality inspection housings of the atomizers must be conducted to prevent electrical corrosion of the atomizer housing and damage the atomizer.
6. After the atomizer has worked for a long time, scale will be deposited on the surface of the housing and the atomizing sheet, which will affect the service life and atomization effect. Therefore, it is recommended to clear the atomizer once every 2 months. When cleaning, it is recommended to gently scrub with a soft cloth. Water flush
7. When the atomizer installation process avoids damage to the water level switch, so as to avoid failure of the water level switch, resulting in loss of control of the atomizer, it will cause the atomization piece to dry, which will seriously damage the atomizer.
8. When you stop using the nebulizer, disconnect the power supply and remove the nebulizer from the water
9. Atomizer for neutral (PH = 7) atomization of acidic solution, can not be in the strong acid or alkaline solution atomization
10. Don't take the atomizer out of the water when it is powered on, or hold it upside down; the atomizer cannot be placed high on one side and lower on the side of the atomizer; the atomizer will first power off and take out the water.
11. Found that the atomizer ruptured, immediately power outage, the atomizer out of the water, to avoid the water from the broken atomizer into the atomizer plate, even the atomizer short-circuit burnout.

 

Payment

1.We accept PayPal only.
2.All major credit cards are accepted through secure payment processor PayPal.
3.We ship to your eBay or Paypal address. Please make sure your eBay and Paypal address is correct before you pay.

Shipping

1.We ship to your eBay or Paypal address. Please make sure your eBay and Paypal address is correct before you pay.
2.Items will be shipped within 1 business day when we received payment.
3.Delivery time depends on destination and other factors;
4.International buyers please note:
  a.Import duties, taxes and charges are not included in the item price or shipping charges. These charges are buyer’s responsibility. We will try our best to reduce the risk of the custom duties.
  b.Please check with your country's customs office to determine what these additional costs will be prior to

 
 

PushAuction
DataCaciques