Seymour Duncan Dave Murray Loaded Pickguard (Pearl)
Item Number 11550-07
Brand New with Full Warranty
Free USPS Priority Shipping
Notice: I open the box to ensure 2 things:
a) That the pickguard is the correct model
b) That the color of the pickguard is correct for the model
The last reason is to add packing material on the pickguard to ensure safe arrival.
We have had issues in the past, and through preemptive action, simple mistakes can be avoided.
Your Strat’s quest for fire is finally over! Fully loaded with Dave Murray’s road tested set up of a JB Jr. flanked by two Hot Rails, this Strat pickguard offers a nearly endless array of classic metal and hard rock tones, all without any hum. The Hot Rails bridge delivers a fat crunch with biting harmonics. The JB Jr. in the middle lends punch and clarity in positions 2, 3 and 4. And the Hot Rails neck nails Dave’s signature warm and expressive lead tone.
This easy to install loaded strat pickguard will have you runnin’ free in no time. Hand built in Santa Barbara, CA, this fully loaded pickguard comes uses an 11 screw ‘USA’ pickguard pattern. These pickups all use small ceramic magnets, 4-conductor ‘splittable’ lead wire, and are vacuum wax potted for squeal free operation. Available in Pearloid, White, or Black pickguard options.
Welcome To Pilgrims Projects
All items come with a 30 day money back guarantee, so your purchase is risk-free.
I have been a musician for over 40 years, and know that quality items can greatly help both your sound quality and musical enjoyment. Using Seymour Duncan items myself in my '52 reissue Tele, and other guitars, I can find the tone I am looking for. With the 30 day exchange, if you don't like the sound, you can send it back to me and try something else from Duncan, or get your money back. Plus, with the one year warranty from Duncan, you are covered should a failure occur.
That's a pretty good deal.
Hopefully, I can be of assistance in your pursuit of great items that you will enjoy for years to come. Your satisfaction is top priority, and I will do everything in my power to make your purchase a worthwhile experience.
Questions?
Drop me a note!
Thanks Again,
John