EMG ACS Acoustic Soundhole Pickup
Red
Item Number 4655.00
Brand New with Full Warranty
Free USPS Priority Shipping
The ACS is EMG's solution for players looking for a great amplified
acoustic guitar tone without the feedback issues. Offering a broader
frequency range and less noise than a piezo pickup, the EMG ACS delivers
authentic acoustic tone with enough volume to play alongside a large
band. With adjustable pole pieces, the sound hole pickup can be tailored
to your needs for both live and studio playing.
The ACS
employs a unique internal preamp that's been tailored for the phase and
frequency response of an acoustic guitar while still retaining a
brilliant top-end favored in acoustic guitar tone. Due to it's
versatility among users and easy installation, the EMG acoustic sound
hole pickup is one of the most popular on the market.
Package Includes EMG's exclusive Solderless Install System:
connect cables
End Pin Jack with cable
cable keepers
battery bag
allen wrenches (.062 & .093 inches)
velcro dot
EMG warranty:
All EMG Pickups and accessories are warranted for a period of two years. This warranty does not cover failure due to improper installation, abuse or damage. If upon examination the pickup is determined to be defective, a replacement will be made. Warranty replacement products are covered by this same warranty.
Welcome to Pilgrims Projects
When it comes to active pickups, EMG is the go-to for countless players. That is why we are proud to carry the EMG line!
Because purchasing a guitar pickup to achieve a certain sound can be tricky, all items come with a 30 day money back guarantee if you don't like the sound. So, essentially your purchase is risk free.
That's a pretty good deal.
Hopefully, I can be of assistance in your pursuit of great items that you will enjoy for years to come. Your satisfaction is top priority, and I will do everything in my power to make your purchase a worthwhile experience.
Questions?
Drop me a note!
Thanks Again,
John