Seymour Duncan PA-STK1n Parallel Axis Stack for Strat Neck/Middle
Black
Item Number 11102-76
Brand New with Full Warranty
Free USPS Priority Shipping
Summary
Stacked Parallel Axis single coil for noiseless Strat-like tone that is bright and clear, with a snappy treble attack.
DescriptionThe Parallel Axis Stack is a noiseless Stratocaster pickup that takes the innovative dual-pole design of the Parallel Axis Trembucker and combines it with our patented Stack technology to deliver a bright, crisp single coil tone. This pickup mounts into any Stratocaster-sized pickup slot and is a great match in the neck or middle pickup for any of our PATB bridge models.
Like all Trembuckers, the Parallel Axis Stack has a wider pole piece spacing, perfect for symmetrical positioning under the strings of guitars with a tremolo or wide spaced hard tail bridge (2” or wider from the center of the Low E to High E directly over the bridge pickup).
Hand made in Santa Barbara, CA, the Parallel Axis Stack noiseless Strat pickup uses our unique dual-pole design for added sustain, a large ceramic bar magnet, 4-conductor wire for multiple wiring options, and is vacuum wax potted for squeal free operation.
Welcome to Pilgrims Projects
All items come with a 30 day money back guarantee, so your purchase is risk-free.
I have been a musician for over 40 years, and know that quality items can greatly help both your sound quality and musical enjoyment. Using Seymour Duncan items myself in my '52 reissue Tele, and other guitars, I can find the tone I am looking for. With the 30 day exchange, if you don't like the sound, you can send it back to me and try something else from Duncan, or get your money back. Plus, with the one year warranty from Duncan, you are covered should a failure occur.
That's a pretty good deal.
Hopefully, I can be of assistance in your pursuit of great items that you will enjoy for years to come.Your satisfaction is top priority, and I will do everything in my power to make your purchase a worthwhile experience.
Questions?
Drop me a note here on eBay
Thanks Again,
John