EMG T52 System Active Pickups for Tele
Black
Item Number 6402.00
Brand New with Full Warranty
Free USPS Priority Shipping
UUsing EMG’s new Retro Active technology, the T 52 System is our twist on the vintage 1952 Tele with the classic twang and edge players have known for 60 years. By combining alnico 5 (bridge) and alnico 2 (neck) we have spun tradition upside down giving players more punch and plenty of body where needed. The Retro Active discrete FET preamp removes all the noise and hum associated with traditional Tele pickups. Players will love the passive feel with active clarity. The T 52 System is an easy solderless drop in replacement that takes minutes to install. Designed and built in California the past has never sounded so good.EMG warranty:
All EMG Pickups and accessories are warranted for a period of two years. This warranty does not cover failure due to improper installation, abuse or damage. If upon examination the pickup is determined to be defective, a replacement will be made. Warranty replacement products are covered by this same warranty.
Welcome to Pilgrims Projects
When it comes to active pickups, EMG is the go-to for countless players. That is why we are proud to carry the EMG line!
Because purchasing a guitar pickup to achieve a certain sound can be tricky, all items come with a 30 day money back guarantee if you don't like the sound. So, essentially your purchase is risk free.
That's a pretty good deal.
Hopefully, I can be of assistance in your pursuit of great items that you will enjoy for years to come. Your satisfaction is top priority, and I will do everything in my power to make your purchase a worthwhile experience.
Questions?
Drop me a note!
Thanks Again,
John