Seymour Duncan Wavelength Solo Volume and Tone Module
Item Number 12530-02
Brand New with Full Warranty
Free USPS Priority Shipping
Unleash the power of your Wavelength™ Solo under-saddle transducer with the Wavelength – Volume & Tone Module. This module puts the control of your volume level and tone-shaping right at your fingertips. A short cable connects the module to the Wavelength Solo endpin preamp, then it’s just a matter of mounting the unit to the inside of your guitar’s soundhole with an adhesive strip. No soldering or alteration to your instrument needed!
Not only do you now have control of the volume and overall tone of your guitar, but there’s also no loss of tone or dampening of vibrations caused by batteries and electronics being attached to a side-mounted pre-amp assembly. This module is only for use with the Wavelength Solo: it is not compatible with the Wavelength Duo.
Welcome to Pilgrims Projects
All items come with a 30 day money back guarantee, so your purchase is risk-free.
I have been a musician for over 40 years, and know that quality items can greatly help both your sound quality and musical enjoyment. Using Seymour Duncan items myself in my '52 reissue Tele, and other guitars, I can find the tone I am looking for. With the 30 day exchange, if you don't like the sound, you can send it back to me and try something else from Duncan, or get your money back. Plus, with the one year warranty from Duncan, you are covered should a failure occur.
That's a pretty good deal.
Hopefully, I can be of assistance in your pursuit of great items that you will enjoy for years to come.Your satisfaction is top priority, and I will do everything in my power to make your purchase a worthwhile experience.
Questions?
Drop me a note!
Thanks Again,
John