Seymour Duncan Black Winter 8 String Humbucker Set
Black
Item Number 11202-92-B8
Brand New with Full Warranty
Free USPS Priority Shipping
Extreme as the Scandinavian Winter, the Black Winter 8 String Set was created for Black Metal, Death Metal, and any other underground style.
The Black Winter is as dark and vicious as the winters in Scandinavia with excessive grime and aggression; the right balance of mids, treble and bass to instantly take you from annihilating riffs to solos with cutting articulation.
The Black Winter fills the needs of extreme metal guitarists with a tone that provides crushing distortion, punishing mids and lots of aggressive saturation and string sensitivity.
Neck and bridge pickups are calibrated for a balanced assault.
Hand built in Santa Barbara, CA, we offer the Black Winter in standard 6-string size, as well as 7 & 8 string passive mount with naked coils (or in Active ‘Soapbar’ Mount with exposed pole pieces).
Comes with 4-conductor lead wire for multiple wiring options, and is vacuum wax potted for squeal free operation.
Welcome to Pilgrims Projects
All items come with a 30 day money back guarantee, so your purchase is risk-free.
I have been a musician for over 40 years, and know that quality items can greatly help both your sound quality and musical enjoyment. Using Seymour Duncan items myself in my '52 reissue Tele, and other guitars, I can find the tone I am looking for. With the 30 day exchange, if you don't like the sound, you can send it back to me and try something else from Duncan, or get your money back. Plus, with the one year warranty from Duncan, you are covered should a failure occur.
That's a pretty good deal.
Hopefully, I can be of assistance in your pursuit of great items that you will enjoy for years to come. Your satisfaction is top priority, and I will do everything in my power to make your purchase a worthwhile experience.
Questions?
Drop me a note here on eBay
Thanks Again,
John