Submarine USS STONEWALL JACKSON SSBN-634 Naval Cover 1979 ANNIVERSARY Cachet

It was sent 26 Aug 1979.  It was franked with stamp "Flag".

This cover is in good, but not perfect condition. Please look at the scan and make your own judgement. 

Member USCS #10385 (I also earned the stamp collecting merit badge as a boy!). Please contact me if you have specific cover needs. I have thousands for sale, including; navals (USS, USNS, USCGC, Coast Guard, ship, Maritime), military posts, event, APO, hotel, postal history, memorabilia, etc. I also offer approvals service with FREE SHIPPING to repeat USA customers.

USS Stonewall Jackson (SSBN-634, active 1963–1995), a James Madison-class fleet ballistic missile submarine, was the third ship of the United States Navy to be named for Confederate States Army General Thomas J. "Stonewall" Jackson (1824–1863).a


Construction and commissioning

The contract to build Stonewall Jackson was awarded to Mare Island Naval Shipyard at Vallejo, California, on 21 July 1961 and her keel was laid down there on 4 July 1962. She was launched on 30 November 1963, sponsored by Miss Julia Christian McAfee, great-granddaughter of General Jackson,[1][2] and commissioned on 26 August 1964, with Commander John H. Nicholson in command of the Blue Crew and Commander Richard A. Frost in command of the Gold Crew.


Service history

Stonewall Jackson departed Vallejo on 3 September 1964 for her shakedown cruise to Cape Kennedy, Florida. The Blue Crew completed training with a successful Polaris ballistic missile firing on 2 December 1964 and was relieved by the Gold Crew. Following the Gold Crew's successful Polaris missile launch on 16 December 1964, Stonewall Jackson returned to the Pacific Ocean to complete shakedown operations. She began post-shakedown alterations and repairs on 13 February 1965, then made final preparations at Bangor, Washington for an overseas deployment. In April 1965, she began her first strategic deterrent patrol.


In June 1965, the Gold Crew relieved the Blue Crew at Apra Harbor, Guam. For the next five years Stonewall Jackson conducted deterrent patrols from Apra Harbor.


In the spring of 1970, Stonewall Jackson was reassigned to the United States Atlantic Fleet. On 23 April 1970, she got underway from Pearl Harbor, Hawaii, to conduct a special operation, before continuing on to the Panama Canal. She transited the canal on 7 May 1970 and changed operational control from Submarine Flotilla 5 to Submarine Flotilla 6, officially joining the Atlantic Fleet. On 15 May 1970, she put into New London, Connecticut.


Stonewall Jackson spent the second half of May 1970 in upkeep at New London, then headed south on 1 June 1970. She stopped at the United States Naval Academy at Annapolis, Maryland, from 7 June to 10 June 1970 for midshipman indoctrination tours, then put to sea for special operations. She entered Charleston, South Carolina, to off-load ballistic missiles during the first week in July 1970, then shaped a course for New London, arriving on 10 July 1970. On 15 July she entered the shipyard of the Electric Boat Division of General Dynamics at Groton, Connecticut, for conversion to carry the Poseidon C-3 ballistic missile system.


The installation of the new missile system was completed by 29 October 1971, when the Blue Crew began preparations to put to sea. Between October 1971 and March 1972, both the Blue Crew and the Gold Crew conducted their shakedown cruises off the southeastern coast of the United States. Stonewall Jackson returned to Groton on 4 March 1971 and, on 8 March, commenced post-shakedown repairs and alterations at the General Dynamics shipyard.


On 7 April 1971, Stonewall Jackson got underway for Charleston for ball