Features:
100% Brand new & High quality
A: high rise building shaft cable branch
1 install and fix the main trunk cable with the traditional method.
In the 2 parts to do the main cable outer sheath branch peel 0.6 meters (do not destroy the line insulation layer)
3 a branch cable (not more than 3 m) with a distance of the meter box is selected, and the end of the two ends of the two ends of the cable are stripped.
4 longitudinal mounted splitter
product performance test
Mechanical properties: grip clamp force greater than 1/10 wire broken in conformity with GB2314-1997 requirements;
Temperature rise performance: in the case of large current, the temperature of the wire clamp is less than the temperature rise of the connecting wire;
Thermal cycling performance: 200 times per second 100A/mm2 large current overload, contact resistance variation is less than 5%;
Waterproof insulation performance: in the water 30 cm, plus more than 3.5kV voltage for 1 minutes, no breakdown phenomenon;
Anti corrosion performance: 3 days in the environment of sulfur dioxide and salt to do 14 days of the cycle test;
Environmental aging performance: in this outside, dry and wet environment, the temperature change and heat shock exposure for six weeks

packing include:
1pcs X piercing connector